FX
80
40
5.4
Maintenance and Inspection Calendar
To avoid damage from body sweat, the equipment must be cleaned with a damp towel (no solvents!)
after each training session.
The following routine tasks must be performed at the specified intervals:
Part
Weekly
Monthly
Quarterly
Display console
C
I
Slide rails*
C
Lubrication of slide rails and moving parts*
I
Plastic covers
C
I
Screws and cable connections
I
Legend: C = clean; I = inspect
*Make sure to always clean the slide rails and moving parts before re-lubricating.
By scanning the QR code with the camera function or QR code scanner app of your smartphone/
tablet, a video on general maintenance of a crosstrainer opens on YouTube. The
video serves to illustrate the maintenance points described in this manual.
Please note that the video may not be available in your language or with
appropriate subtitles.
If you cannot scan QR codes, you can access all Sport-Tiedje videos on YouTube by
first opening YouTube and entering “Sport-Tiedje” in the search field.
6
DISPOSAL
At the end of its operational life, this equipment cannot be disposed of in normal household waste.
Instead, it must be disposed of via an electricals recycling centre. Further information can be
obtained from your local authority‘s recycling service.
The materials can be recycled as per their symbols. Through the reuse, recycling
of materials or other forms of recovery of old equipment, you make an important
contribution to the protection of the environment.
Summary of Contents for CST-FX80
Page 2: ...FX80 2...
Page 31: ...31...
Page 47: ...47 8 3 Exploded Drawing...
Page 52: ...FX80 52 Notes...
Page 53: ...53 Notes...
Page 54: ...FX80 54 Notes...
Page 55: ...55...
Page 56: ......