-39-
Maintenance
5
Drive Train
• Stop engine when servicing drive train.
• Allow machine to cool off before servicing. Engine is very hot after operation
and may pose a burn hazard.
Track
1. Jack up machine so that track is parallel to
the ground.
2. Inspect the clearance between track and
center roller (clearance A) to be between 10
and 15mm. Adjust tracks if the clearance is
not within this range.
3. Lower machine.
Inspecting
• Jack up machine securely when inspecting and adjusting track. Jack it up on a
level ground.
• Always unload machine before jacking up.
• Make certain to adjust track tension properly. Inproperly tensioned tracks may
wear or come off, resulting in property damage, serious injury or death.
3568M-0507-110E
A
• Track stretches during its use-life. Inspect and adjust regularly.
NOTE