-31-
Maintenance
5
Item
Description
Schedule
Note
PSI
Mon
Year
Drive T
rain
Linkage
Rods, links, and wires in linkage shall be free
of deformation or damage.
√ √ √
Connections shall be free of looseness,
excessive play, or missing cotter pins.
√ √ √
Body
, Chassis, Loading Deck, Safety Devices
Chassis
Frame
Shall be free of cracks, deformation, or
corrosion.
√ √
Fastening bolts or nuts shall not be loose or
missing.
√ √
Body Panels
Shall be free of cracks or deformation.
√ √
Fastening bolts or nuts shall not be loose or
missing.
√ √
Loading Deck
Loading deck shall raise and lower smoothly.
√ √
Panels shall slide and open smoothly and
can be locked in place securely.
√ √
Shall be free of cracks, deformation, or
corrosion.
√ √
Fastening bolts or nuts shall not be loose or
missing.
√ √
Safety Lock
Plate
Safety lock plate shall be free of any
deformation.
√ √
Labels
Warning labels and instruction plates shall be
clean, legible, and free of damage.
√ √ √
Hydraulic System
Hydraulic
Package
Hydraulic fluid shall be clean and at correct
level.
√ √
Inspecting/Changing:
Page 44
No leaks shall be found in or around
hydraulic package.
√ √
Fastening bolts and nuts shall not be loose
or missing.
√ √
Breather shall not be clogged.
√
There shall be no leaks in pipes, hoses,
joints, or seals.
√ √
No irregular vibration, noise, or heat shall
be observed when hydraulic package is in
operation.
√
Amount and pressure of discharge under
load shall be within the standard range
specified by the manufacturer.
*this may be skipped if irregular vibration,
noise, or heat described above is not
observed.
√