Installation Instructions Model : Z3460
Further information Phone (03) 9761 4603 [email protected]
❹
Before use
Turn on the Hot and Cold supplies to the tap.
Maximum temperature for Hot water supply to the tapware is 62 °C.
Minimum recommended pressure is 100 kPa — Maximum recommended pressure is 500 kPa.
Check the installation carefully for leaks.
If further building work is to be carried out in the vicinity of the tapware, it should be covered to
prevent paint, adhesive, etc. from damaging the surface.
❸
6
Using the Allen key, firmly hand tighten the
grub screw and secure the dome leaver
onto the mixer leaver.
Install the indice button
10
, into the access
hole, and ensure that it is firmly pressed
into position.