background image

2181655A

 - March 2022

OMNICARE

SR

 

pumped shower

INSTALLATION AND OPERATING INSTRUCTIONS 

Please read this book thoroughly and familiarise yourself with all instructions before commencing 

installation and keep it for future reference. 
The shower installation 

MUST

 be carried out by a suitably qualified person, 

in the sequence of  

this instruction book. 

IMPORTANT SAFETY ADVICE

The shower unit 

MUST BE

 switched off at the 

isolating switch when not in use. This is a  

safety procedure recommended for all 

electrical appliances.
The shower head and hose supplied with this 

product are a safety critical part of your shower. 

Failure to use genuine Triton parts may cause 

injury and invalidate your guarantee.

FOR YOUR SERVICE REFERENCE

NOTE DOWN THE PRODUCT CODE BELOW

(FROM THE FRONT OR TOP OF THE BOX)

ALTERNATIVELY REGISTER BY TEL: 024 7637 8321

THIS OFFER IS NOT VALID OUTSIDE THE UK

REGISTER ONLINE

ENTER A PRIZE DRAW

WIN

£100

LOVE2SHOP VOUCHERS

VISIT OUR WEBSITE TODAY

TRITONSHOWERS.CO.UK/REGISTER

PRODUCT REGISTRATION IS ONLY AVAILABLE

TO UNITS PURCHASED & INSTALLED IN THE UK

!  IMPORTANT  !

Under *NO circumstances must this shower be connected directly 

to a mains water supply. It is designed for GRAVITY FED  

COLD WATER systems ONLY !

*Failure to comply may invalidate product warranty

Summary of Contents for Omnicare

Page 1: ...d and hose supplied with this product are a safety critical part of your shower Failure to use genuine Triton parts may cause injury and invalidate your guarantee FOR YOUR SERVICE REFERENCE NOTE DOWN THE PRODUCT CODE BELOW FROM THE FRONT OR TOP OF THE BOX ALTERNATIVELY REGISTER BY TEL 024 7637 8321 THIS OFFER IS NOT VALID OUTSIDE THE UK REGISTER ONLINE ENTER A PRIZE DRAW WIN 100 LOVE2SHOP VOUCHERS...

Page 2: ...nected to any tap or fitting other than those specified This appliance must not be connected to the water mains supply and not connected by a hose set A suitable double pole isolation switch for supply disconnections must be incorporated in the fixed wiring circuit in accordance with current wiring rules See Electrical Installation section for further details Minimum inlet pressure 0 08 metres 0 7...

Page 3: ...y with Water Regulations Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS EN 806 2 2 The supply pipe must be flushed to clear debris before connecting to the shower unit 2 3 DO NOT solder pipes or fittings within 300mm of the shower unit as heat can transfer along the pipework and damage components 2 4 D...

Page 4: ...rtant To comply with BEAB Care mark requirements the unit must not be able to run hotter than 41 C this is used when in healthcare or special needs environments The Omnicare SR Pumped unit is factory set at 43 C nominal see page 22 on how to adjust the MAXIMUM temperature to 41 C At a selected showering temperature the unit will provide the optimum flow rate possible Note the flow rate for any sho...

Page 5: ...Design Digi 8 5kW ü ü ü Mains TEOMNDD81 TEOMNDDG81 9 5kW ü ü ü Mains TEOMNDD91 TEOMNDDG91 OMNICARE MODELS WEEE Directive Policy Statement As a producer and a supplier of electric showers Triton Showers is committed to the protection of the environment via our own environmental policy and compliance with the WEEE directive Triton Showers is fully registered with the Environment Agency under the fol...

Page 6: ...tioning of Shower 14 PlumbingConnections 15 16 Fixing to Wall 16 Electrical Connections 17 Shower Drain Pumps not supplied 18 PCB Dip Switch Settings 19 Commissioning 20 21 Adjusting the Maximum Temperature Stop 22 BEAB Care 23 Fitting the Cover 24 Operating Instructions 25 29 Maintenance Cleaning the Filter 30 Fault Finding Troubleshooting 31 32 Maintenance BEAB Care 33 In service Commissioning T...

Page 7: ...inlet of the shower 8kPa 0 08 bar at 8 litres per minute Minimum head height 8cm Maximum Static Pressure 100 kPa 1 bar Maximum inlet temperature 28 C 20 C BEAB Care Minimum inlet temperature 2 C 5 C BEAB Care Inlet connection 15mm diameter Outlet connection BSP male thread MATERIALS ABS Backplate cover controls shower head Minerally insulated corrosion resistant metal sheathing Elements STANDARDS ...

Page 8: ...safety cut out 5 Power printed circuit board 6 Can and element assembly 7 Pressure switch assembly 8 Temperature control 9 Terminal block 10 Earth connection 11 Solenoid valve 12 Water inlet 13 Pressure relief device PRD 14 Shower outlet 15 Filter 16 Pump power supply 17 Pump 18 Trimplate 19 Bottom cable pipe entry 20 Triac PCB Inside the unit 2 2 2 3 3 3 19 MAIN COMPONENTS 20 ...

Page 9: ...side the cover 22 23 21 Cover 22 Stop start switch 23 Control printed circuit board 21 Front cover MAIN COMPONENTS DIMENSIONS ENTRY POINTS Diagram Key Water Entry Points Cable Entry Points 88mm 316mm 300mm ...

Page 10: ...AB Care mark in service testing procedure the isolating valve should be located close to the shower unit 7 Important Before completing the connection of the water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by connecting a hose to the pipework and turning on the mains water supply long enough to clear the debris to waste 8 Imp...

Page 11: ...eight of shower should be a minimum of 1 metre from base Spillover level Height of shower head and shower to suit user s requirement Fig 1 Diagrammatic view not to scale For illustration purposes only Kits may vary WARNING The shower MUST NOT be positioned where it will be subjected to freezing conditions INSTALLATION REQUIREMENTS ...

Page 12: ...or the shower rating 7 If your consumer unit has a rating below 80A or if there is no spare fuse way then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower Contact a professional electrician local electricity company for advisement 8 For close circuit protection DO NOT use a rewireable fuse Instead use a suitably rated Miniature C...

Page 13: ...the diameter of the cable or conduit The current rating will be reduced if the cabling is bunched with others surrounded by thermal loft or wall insulation or placed in areas where the ambient temperature is above 30 C Under these conditions derating factors apply and it is necessary to select a larger cable size In the majority of installations see Fig 2 the cable will unavoidably be placed in on...

Page 14: ...the ceiling and the shower to access the top cover screws Using the backplate as a template mark out the entry points and routing of the water and electric supplies into the shower Find our step by step installation video for this product on our YouTube channel Go to youtube com TritonShowers and search for how to guides 1 Step Step Remove the front cover assembly Remove the pipe trims that aren t...

Page 15: ...omponents IMPORTANT Before connecting the shower to the plumbing pipework flush out the pipework for approximately 60 seconds to remove any swarf or debris PRD escape vent DO NOT BLOCK OR SEAL 2 Step Step Bottom Entry Top Entry Rear Entry Rotate inlet fitting to suit the required water supply pipe entry position Take care not to trap or tangle earth wire on the inlet fitting ...

Page 16: ...s Reconnect the shower to plumbing pipework and secure the shower to the wall using appropriate screws IMPORTANT Ensure the shower is securely fixed to the wall DO NOT use adhesives as a method of securing the appliance to the wall 5 Step Step Ensure that all pipe connection fittings are tight DO NOT overtighten Turn on mains water supply and check the pipework for any water leakage IMPORTANT Use ...

Page 17: ...the appropriate position on the terminal block Note The earth conductor must be sleeved The outer sheath of any conductor must be stripped back to a minimum Fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws IMPORTANT Loose connections can result in cable overheating DO NOT switch on the electricity supply Earth cable Green Yellow to Neutral ...

Page 18: ...he shower The pump manufacturer provides a two core cables for connection to the shower unit Connect the drain pump Control Wire as below 1 Any 2 Any Note Please reference the relevant pump manufacturers installation instructions for pump connection and relevant IEE regulations Connection for Analogue Drain Pumps When the shower is turned on a signal is sent to the drain pump electronics telling t...

Page 19: ...ch 3 On DIP switch 2 On Timed Shutdown 20 Mins DIP switch 3 Off DIP switch 2 On Timed Shutdown 30 Mins DIP switch 3 On INSTALLATION Dip Switch Settings A four way DIP switch block is mounted on the control PCB that allows the user to configure the shower to perform different functions ON 1 2 3 ON ON ON ON ON ON 1 Factory setting Factory setting Off On 5 Mins 10 Mins 20 Mins 30 Mins 8 Step Step 2 3...

Page 20: ...er supply to the unit on and turn the bleed screw approximately 3 turns out make sure that an absorbent cloth is in place to catch any purged water Let the water flow approximately 30 60 seconds until a steady stream of water flow with no bubbles then re tighten the bleed screw Turn the water supply back off INSTALLATION Open Turn bleed screw 3 turns out 9 Step Step 9 1 Step Step 9 2 Step Step 9 1...

Page 21: ...rature control to number 1 then enable the power to the isolation switch Turn the isolation switch on The pump will operate and water will begin to flow from the shower hose The pump will pulse on for 15 seconds and off for 10 seconds Allow the shower to complete its commissioning cycle until the water ceases flow Isolate the electricty to the shower at the isolating switch Note The commissioning ...

Page 22: ... cover assembly please see page 24 and restore mains electrical power to the unit IMPORTANT The temperature settings shown are at nominal supply conditions For extreme supply conditions it may not always be possible to achive the temperatures shown Allow the shower 30 seconds to stabilise and measure the shower outlet water temperature 10 Step Step 10 1 Step Step 10 2 Step Step INSTALLATION Loosen...

Page 23: ... locking screw securing the temperature face plate See Rotate the temperature face plate to align the 41ºC slot with the screw hole See Reconnect the power PCB cable and replace the cover assembly See Restore mains electrical power to the unit Start the shower by pressing the start stop button The shower should be run for a minimum of 30 seconds to allow the water temperature from the shower head ...

Page 24: ... be fitted to the socket only one way 13 Step Step Guide the cover into position so that the temperature selector locates correctly onto the valve minor adjustment of the temperature dial may be necessary to align with the valve Apply slight pressure to the cover and secure in position with the 3 retaining screws ...

Page 25: ...lly The shower can be stopped by pressing the start stop button When pressed the phased shutdown will begin and water will cease to flow after a few seconds To Stop the Shower Timed Shutdown Shutdown times can be set at 5 10 20 factory setting or 30 minutes When the Timed Shutdown indicator illuminates it indicates there is 1 minute before the timed shutdown will turn the shower off Power On indic...

Page 26: ... temperature control can alter the flow of water through the unit After obtaining your preferred showering temperature the number setting can be remembered and left as the preferred setting Important When set to 41 C BEAB Care setting the temperature lever will sit at approximately setting 5 as its maximum position Approximately setting 5 as the maximum DO NOT FORCE THE LEVER ANY FURTHER ONCE RESI...

Page 27: ... to remove heated water inside the unit see phased shutdown process on page 28 Water will cease to flow after a few seconds After phased shutdown the unit must be isolated via the 45amp isolating switch OPERATING INSTRUCTIONS Note It is advisable to be certain that the showering temperature is satisfactory by testing with your hand before stepping under the shower head There will always be a time ...

Page 28: ...n flash for 5 seconds prior to the shower switching off an audible beep will also commence if it has been set to do so see Installation Section for information on how to program the unit Phased Shutdown In use every time the Start Stop button is pressed power is switched off to the elements Water will continue to flow for a few seconds flushing out any remaining hot water This ensures the next imm...

Page 29: ...ly restored to the setting at the time of interruption Safety Cut out The unit is fitted with an over temperature safety device In the event of abnormal operation which could cause unsafe temperatures within the unit the device will disconnect the heating elements and remove power from the electronics making the shower unit inoperable OPERATING INSTRUCTIONS It will require a visit from a qualified...

Page 30: ...n Switch off the electricity and water supply to the shower The inlet filter is situated inside the water inlet fitting To gain access to the filter remove the cover and right hand trim plate Unscrew the cap on the water inlet fitting Inspect the o ring for damage when the filter is removed Do not over tighten the filter cap on reassembly When cleaning the filter DO NOT use a sharp object as it wi...

Page 31: ...2 2 Have unit checked Contact Customer Experience 1 3 1 The thermal cut out safety device has operated Have the unit checked by a suitably qualified service engineer or contact Customer Experience 2 1 1 Alter the temperature control 2 2 1 Have the unit checked by a suitably qualified service engineer or contact Customer Experience 3 1 1 Alter the temperature control 3 2 1 Alter the maximum tempera...

Page 32: ...safety device operated Note After 3 failures on NTC unit will continue to show same fault 7 1 1 Shower will not start until water in the unit has cooled and LED goes off If problem persists 1 Check shower head is not blocked 2 Check shower hose is not restricted 3 Check filter is not blocked 4 Check water supply to shower is adequate 8 1 1 Pressure flow switch assembly 9 1 1 Replace cover assembly...

Page 33: ...ry out the following sequence a record the supply voltage at the terminals of the appliance b record the outlet water temperature and the flow rate resulting from the setting c reduce the water supply flow rate at the inlet of the appliance by at least 50 or to the lowest value at which the appliance continues to deliver an output of heated water whichever is the greater pressure d record the outl...

Page 34: ...minals of the appliance b Record the outlet water temperature and the flow rate resulting from the setting c Reduce the water supply flow rate at the inlet of the appliance by at least 50 or to the lowest value at which the appliance continues to deliver an output of heated water whichever is the greater pressure d Record the outlet water temperature and the reduced flow rate NOTE The outlet water...

Page 35: ...ature then the next in service test can be deferred to 24 to 28 weeks after commissioning c If small changes e g 1 to 2 C in outlet water temperatures are recorded in both of these periods necessitating adjustment of the outlet water temperature then the next in service test should be carried out at 18 to 21 weeks after commissioning d If significant changes e g 2 C in outlet water temperatures ar...

Page 36: ...ication Date of last Calibration Supply water pressure Voltage Water temperature Note All installation commissioning and in service testing must be undertaken by a suitably qualified engineer With unit turned on set the temperature control to maximum temperature stop This test should be performed by measuring temperature from a gravity fed cold water tap Commissioning List of Test Equipment Used T...

Page 37: ... of next in service check or withdrawal from service Signed dd mm yy ºC V ºC ºC dd mm yy Note All installation commissioning and in service testing must be undertaken by a suitably qualified engineer Check that the maximum temperature stop is set to 41ºc see BEAB Care section In service Testing Record Ambient temperature of water supply see Note 2 This page may be reproduced for continued recordin...

Page 38: ...ould be returned to the fully open position after this test 4 Measurement of Supply Voltage at Appliance Terminals Switch off the electricity at the mains supply and remove the circuit fuse Remove the shower cover taking care to position it so that it does not hang by the interconnecting ribbon cable Replace the circuit fuse and switch on the electrical mains supply Take the AC voltage reading acr...

Page 39: ...r commissioning On going service testing Annually on the anniversary date when the unit was commissioned OMNICARE SR PUMPED In service Testing Omnicare SR Pumped Designation Code IW S Shower OMNICARE SR PUMPED To purchase a genuine Triton spare part for your product please visit www tritonshowers co uk spares for product codes and prices Alternatively please call our Customer Experience team on 02...

Page 40: ...iners Card Payment can also be made by pre payment of a pro forma invoice by cheque or postal order Telephone orders are based on information given during the call Before contacting Triton please verify your requirements using the Triton website or your professional installer Triton cannot accept liability for incorrect part identification TRITON UK STANDARD GUARANTEE This guarantee applies only t...

Reviews: