※
Install the connecting bracket
right and left equally.
D1 side beam
with / without cap
Ya
88
86
83.5
82.5
81.5
79.5
82
87
86
85.5
85
84
85
85
84.5
84
82.5
84
83
82.5
81.5
83
82
81
82.5
80.5
82
80.5
Yb
128
126
123.5
122.5
121.5
119.5
122
127
126
125.5
125
124
125
125
124.5
123.5
122.5
124
123
122.5
121.5
123
122
121
122.5
120.5
121.5
120.5
X1a
50.5
52
53
53.5
52
54.5
54.5
50.5
50.5
50.5
50
50
51
52
52
51.5
51.5
52.5
53
53
53
53.5
53.5
53.5
54
54.5
54.5
55
X1b
54
54.5
55
55
52
54.5
56
53.5
53
53
52.5
52
53.5
54.5
54
54
53
54.5
55
55
54.5
55.5
55.5
55
55.5
55.5
56
56
X2a
50.5
52
53
53.5
52
54.5
54.5
51.5
52
52.5
52.5
53.5
53
52.5
53
53.5
54
53.5
53.5
54
54.5
54
54
55
54
55
54
53.5
X2b
54
54.5
55
55
52
54.5
56
54.5
55
55
55
55.5
55.5
55
55
55.5
55.5
55.5
55.5
55.5
56
55.5
56
56
55.5
56
55
54.5
D1 + D2
① : 18type + 18type
② : 21type + 21type
③ : 24type + 24type
④ : 25type + 25type
⑤ : 27type + 27type
⑥ : 30type + 30type
⑦ : 33type + 33type
a : 18type + 21type
b : 18type + 24type
c : 18type + 25type
d : 18type + 27type
e : 18type + 30type
f : 18type + 33type
g : 21type + 24type
h : 21type + 25type
i : 21type + 27type
j : 21type + 30type
k : 21type + 33type
l : 24type + 25type
m : 24type + 27type
n : 24type + 30type
o : 24type + 33type
p : 25type + 27type
q : 25type + 30type
r : 25type + 33type
s : 27type + 30type
t : 27type + 33type
u : 30type + 33type
D2 side beam
2
Install beam connecting bracket
Connect the beams with the beam connecting bracket as the clearance
between D1 front frame and D2 front frame is 35mm.
■
Dimension of holes on beam
For beam without beam caps
For beam attached caps
35
D1
D2
Washer 8
φ9
Make holes on-site
Connecting material
Beam
Beam connecting bracket
Hexagon bolt
M8×95
Washer 8
Spring washer 8
Nut M8
Front frame
X1a
X1b
Ya
Yb
Ya
Yb
X2a X2b
φ9
through hole
D1
D2
X1a
X1b
Ya-4.5
Yb-4.5
Ya-4.5
Yb-4.5
X2a X2b
φ9
through hole
D1
D2
5