Post out/out dimension

 ① : 

In case of

  D18 + D18  D=3635mm

 ② : 

In case of 

D21 + D21  D=4235mm

 ③ : 

In case of 

D24 + D24  D=4835mm

 ④ : 

In case of 

D25 + D25  D=5115mm

 ⑤ : 

In case of 

D27 + D27  D=5435mm

 ⑥ : 

In case of 

D30 + D30  D=6035mm

 ⑦ : 

In case of 

D33 + D33  D=6635mm

 a : 

In case of 

D18 + D21  D=3935mm

 b : 

In case of 

D18 + D24  D=4235mm

 c : 

In case of 

D18 + D25  D=4375mm

 d : 

In case of 

D18 + D27  D=4535mm

 e : 

In case of 

D18 + D30  D=4835mm

 f : 

In case of 

D18 + D33  D=5135mm

 g : 

In case of 

D21 + D24  D=4535mm

 h : 

In case of 

D21 + D25  D=4675mm

 i : 

In case of 

D21 + D27  D=4835mm

 j : 

In case of 

D21 + D30  D=5135mm

 k : 

In case of 

D21 + D33  D=5435mm

 l : 

In case of 

D24 + D25  D=4975mm

 m : 

In case of 

D24 + D27  D=5135mm

 n : 

In case of 

D24 + D30  D=5435mm

 o : 

In case of 

D24 + D33  D=5735mm

 p : 

In case of 

D25 + D27  D=5275mm

 q : 

In case of 

D25 + D30  D=5575mm

 r : 

In case of 

D25 + D33  D=5875mm

 s : 

In case of 

D27 + D30  D=5735mm

 t : 

In case of 

D27 + D33  D=6035mm

 u : 

In case of 

D30 + D33  D=6335mm

Please implant the post as below in order to 
adjust the top end of the roof.

In case of a,   implant the post for D21   42.9mm deeper than the post for D18.
In case of b,  implant the post for D24   79.4mm deeper than the post for D18.
In case of c,   implant the post for D25   95.2mm deeper than the post for D18.
In case of d,  implant the post for D27  111.8mm deeper than the post for D18.
In case of e,   implant the post for D30  138.9mm deeper than the post for D18.
In case of f,   implant the post for D33  175.1mm deeper than the post for D18.
In case of g,  implant the post for D24   36.5mm deeper than the post for D21.
In case of h,  implant the post for D25   52.2mm deeper than the post for D21.
In case of i,   implant the post for D27   68.9mm deeper than the post for D21.
In case of j,   implant the post for D30   95.9mm deeper than the post for D21.
In case of k,   implant the post for D33  132.2mm deeper than the post for D21.
In case of l,   implant the post for D25   15.8mm deeper than the post for D24.
In case of m,  implant the post for D27   32.4mm deeper than the post for D24.
In case of n,  implant the post for D30   59.5mm deeper than the post for D24.
In case of o,  implant the post for D33   95.7mm deeper than the post for D24.
In case of p,  implant the post for D27   16.6mm deeper than the post for D25.
In case of q,  implant the post for D30   43.7mm deeper than the post for D25.
In case of r,   implant the post for D33   79.9mm deeper than the post for D25.
In case of s,   implant the post for D30   27.1mm deeper than the post for D27.
In case of t,   implant the post for D33   63.3mm deeper than the post for D27.
In case of u,  implant the post for D33   36.2mm deeper than the post for D30.

1

Installation of connecting material

Installation procedure

After installing the roof as below figure, install the connecting material on the front frame.

Before installing the roof panels, install the connecting material.

G.L

D1

D=D1+D2+35

D2

35

4

Summary of Contents for PJR Series

Page 1: ...lides down from the building roof directly There is a possibility that products are damaged by snow falling When installing it besides wall etc keep enough clearance between the product and the wall d...

Page 2: ...st type adjusting to post position of 3 post type Strike the front frames and do sealing work below figure A part Peel the back sheet of water proof cover and attach the water proof cover on the joint...

Page 3: ...JRG B 1 2 PJRG B PJRG B 1 3 2 PJRG B PJRG B 1 9 8 5 4 PJRG B PJRG B 1 Washer 8 8 4 PJRG B PJRG B 1 16 8 PJRG B PJRG B 1 Hexagon bolt M8 85 8 4 PJRG B PJRG B 1 Nut M8 8 4 PJRG B PJRG B 1 1 PJRG B PJRG...

Page 4: ...the post for D18 In case of f implant the post for D33 175 1mm deeper than the post for D18 In case of g implant the post for D24 36 5mm deeper than the post for D21 In case of h implant the post for...

Page 5: ...5 55 5 56 55 5 56 56 55 5 56 55 54 5 D1 D2 18type 18type 21type 21type 24type 24type 25type 25type 27type 27type 30type 30type 33type 33type 18type 21type 18type 24type 18type 25type 18type 27type 18...

Page 6: ...rval and set in the front frame connecting parts Fix the front frame connecting parts to the back plate inserted into the connecting material with small truss screw 5 15 10 Set in Insert Front frame c...

Page 7: ...connecting cap Insert the connecting cap to connecting material and fix with drilling screw 4 10 8 Do sealing work to the touching part Drilling screw 4 10 8 Front frame Connecting cap Connecting mat...

Page 8: ...WB 48 70 4675 4 WB 48 70 D 4223 2 WB 42 70 4083 2 WB 42 70 Post Internal WB 51 4811 2 Post Internal WB 54 5126 Post Internal WB 60 5715 4 Post Internal WB 42 3943 2 Post Internal WB 48 4535 4 Post Cen...

Page 9: ...OM ENDS FOOTING DETAILS PIT FOOTING 900 x 900 x 900 PILE FOOTING 450 x 1500 BMS450 SMS65 METAL SLEEVE ADVANTAGE 1 Eliminates error in height The metal sleeves are inserted into the concrete footing an...

Page 10: ...of edge of SHS 130 Keep brace rod clear of edge of SHS Footing 900x900x900 Footing 450 dia x 1500 65 x 65 x 3 SHS Existing Ground level FRONT ELEVATION FRONT ELEVATION Footing 450 dia x 1500 65 x 65 x...

Page 11: ...Existing concrete driveway Baseplate to cover concrete access hole Ramset Chemset 101 Plus with N16 Grade 500 Threaded Rod Hole depth Min 200mm Footing 900x900x900 Footing 450 dia x 1500 Existing conc...

Reviews:

Related manuals for PJR Series