background image

Notes for M connection of 2-post type and 3-post type

Notes for in-line connection and in-line short extension of M-connection type

In case of M connection of 2-post type and 3-post type, add the post and beam to 2-post type in the center. And
move the post position of 2-post type adjusting to post position of 3-post type.

Strike the front frames and do sealing work (below figure A part).

Peel the back sheet of water proof cover and attach the water proof cover on the joint part. Then do sealing work to

part B.

In case of in-line connection of M-connection type, cover the joint part with the water proof cover.

2-post type

post

3-post type

beam

Water proof cover

Connecting material

Adhesive tape

Sealing

A part

B part

B part

Front frame

Strik

e

2

Summary of Contents for PJR Series

Page 1: ...lides down from the building roof directly There is a possibility that products are damaged by snow falling When installing it besides wall etc keep enough clearance between the product and the wall d...

Page 2: ...st type adjusting to post position of 3 post type Strike the front frames and do sealing work below figure A part Peel the back sheet of water proof cover and attach the water proof cover on the joint...

Page 3: ...JRG B 1 2 PJRG B PJRG B 1 3 2 PJRG B PJRG B 1 9 8 5 4 PJRG B PJRG B 1 Washer 8 8 4 PJRG B PJRG B 1 16 8 PJRG B PJRG B 1 Hexagon bolt M8 85 8 4 PJRG B PJRG B 1 Nut M8 8 4 PJRG B PJRG B 1 1 PJRG B PJRG...

Page 4: ...the post for D18 In case of f implant the post for D33 175 1mm deeper than the post for D18 In case of g implant the post for D24 36 5mm deeper than the post for D21 In case of h implant the post for...

Page 5: ...5 55 5 56 55 5 56 56 55 5 56 55 54 5 D1 D2 18type 18type 21type 21type 24type 24type 25type 25type 27type 27type 30type 30type 33type 33type 18type 21type 18type 24type 18type 25type 18type 27type 18...

Page 6: ...rval and set in the front frame connecting parts Fix the front frame connecting parts to the back plate inserted into the connecting material with small truss screw 5 15 10 Set in Insert Front frame c...

Page 7: ...connecting cap Insert the connecting cap to connecting material and fix with drilling screw 4 10 8 Do sealing work to the touching part Drilling screw 4 10 8 Front frame Connecting cap Connecting mat...

Page 8: ...WB 48 70 4675 4 WB 48 70 D 4223 2 WB 42 70 4083 2 WB 42 70 Post Internal WB 51 4811 2 Post Internal WB 54 5126 Post Internal WB 60 5715 4 Post Internal WB 42 3943 2 Post Internal WB 48 4535 4 Post Cen...

Page 9: ...OM ENDS FOOTING DETAILS PIT FOOTING 900 x 900 x 900 PILE FOOTING 450 x 1500 BMS450 SMS65 METAL SLEEVE ADVANTAGE 1 Eliminates error in height The metal sleeves are inserted into the concrete footing an...

Page 10: ...of edge of SHS 130 Keep brace rod clear of edge of SHS Footing 900x900x900 Footing 450 dia x 1500 65 x 65 x 3 SHS Existing Ground level FRONT ELEVATION FRONT ELEVATION Footing 450 dia x 1500 65 x 65 x...

Page 11: ...Existing concrete driveway Baseplate to cover concrete access hole Ramset Chemset 101 Plus with N16 Grade 500 Threaded Rod Hole depth Min 200mm Footing 900x900x900 Footing 450 dia x 1500 Existing conc...

Reviews:

Related manuals for PJR Series