Version 3
imagePRESS 1110+ Customer Expectations Document
Page 54
The table below indicates the estimated length of time needed to install the main
unit and optional accessories from the time the machine is unpacked to when it is
installed, and calculated from the average amount of manpower hours. The
estimated installation times are based on four (4) experienced technicians.
Description
Estimated Time
imagePRESS 1110+ – Main Unit
46 Minutes
Color Image Reader-L1
16 Minutes
POD Deck-C1
20 Minutes
Secondary POD Deck-C1
55 Minutes
Multi Drawer Document Insertion Unit-A1
18 Minutes
High Capacity Stacker-E1
21 Minutes
Secondary High Capacity Stacker-E1
24 Minutes
Professional Puncher-B1 + Professional Puncher Integration Unit-A1
21 Minutes
Perfect Binder-C1
45 Minutes
Document Insertion Unit-F1
(When connecting it with the Finisher-AK1/Saddle Finisher-AK2)
17 Minutes
Paper Folding Unit-F1
(When connecting it with the Finisher-AK1/Saddle Finisher-AK2)
20 Minutes
Finisher-AK1
18 Minutes
Saddle Finisher-AK2
19 Minutes
Puncher Unit-BS1
13 Minutes
Booklet Trimmer-D1
35 Minutes
Two-Knife Booklet Trimmer-A1 (When attached to the Booklet Trimmer)
18 Minutes
Two-Knife Booklet Trimmer-A1 (When the Booklet Trimmer is not
attached)
16 Minutes
SDD Square Fold Booklet-Maker + Two-Knife Trimmer
120 minutes
Additional Memory Type C (512 MB)
7 Minutes
System Upgrade RAM-B1
7 Minutes
Voice Guidance Kit-E1
20 Minutes
PCI Bus Expansion Kit
11 Minutes
IPSec Board
11 Minutes
Card Reader-C1
20 Minutes
Removable HDD Kit
24 Minutes
HDD Data Encryption Kit-B7 (Color Image Reader-L1 installed)
14 Minutes
HDD Data Encryption Kit-B7 (Color Image Reader-L1 not installed)
12 Minutes
imagePRESS Server K200/K100
4 Minutes