background image

124 

 

LINK-KITS 

 

 

 

 

 

 

 

 

SPECIFICATIONS 

Material/Composition: 

HDPE and SS 316 L 

Available colors: 

Beige and Gray  

Needed tools: 

15/16’’ ratchet socket and wrench 

 

 

 

TERMINOLOGY 

UPPER LINK:

 

Rotomolded plastic piece that fills the voids of the piling openings on the JETROLLS. 

THREADED ROD AND HARDWARE:

 

SS 316 and brass hardware to link the upper and lower link parts together. 

LOWER LINK:

 

HDPE plate fitted underneath the Jetroll allows for a complete assembly of the LINK KIT.

 

 

OVERVIEW 

The addition of LINK KITS between multiple JETROLLS may be suggested or mandatory depending on the environment and 
conditions the systems are to be installed in. Please refer to your Candock distributor to know if LINK KITS should be included on 
your system. The addition of LINK KITS provides a stiffer assembly and prevents the JETROLLS from moving/sinking independently.  

 

ASSEMBLY PROCEDURE 

PRIOR TO INSTALLATION 

Position the JETROLLS in the water at their final location before installing the LINK KITS  

One person should be standing on the JETROLLS with one tool, and the other person should be in the water with the other tool to hold 
the “bottom” hardware. 

 

 

 

 

 

SKU NUMBERS 

LINK KIT BEIGE: 

B0369 

LINK KIT GRAY: 

B0368

 

 

Summary of Contents for JETROLL

Page 1: ...rchasing a Candock product from Candock Inc or one of its duly authorized representatives and distributors should activate the Manufacturer s warranty of its product s via Candock s online warranty ac...

Page 2: ...less steel shafts allowing for even easier berthing and unberthing maneuvers Furthermore as it requires virtually no assembly it offers advantages that are not to be neglected Depending on the environ...

Page 3: ...located under tab 0 and under 1 The 2 outside tabs are the lowest under 1 and the 2 center ones are the highest under 0 This particularity allows for our EDGE cubes to be merged at the front of the J...

Page 4: ...ped on into the circular openings on the 4 corners of the JETROLL Depending and the adequate anchoring layout and accessories these are to be inserted in the remaining openings to prevent a trip hazar...

Page 5: ...GOING DOWN THE SYSTEM To go back into the water initiate the procedure by pushing the PWC backward of 30 60cm 1 to 2 to bring the machine s weight towards the back of the system Then stand up at the...

Page 6: ...TS between multiple JETROLLS may be suggested or mandatory depending on the environment and conditions the systems are to be installed in Please refer to your Candock distributor to know if LINK KITS...

Page 7: ...125 PROCEDURE 1 Position the upper and lower links onto the JETROLL connection point 2 Insert threaded rods with washers from the top 3 Place and hold the lower link underneath the JETROLLS...

Page 8: ...126 3 Insert the lower hardware and hold it in place while the person on the JETROLLS screws the threaded rod in place...

Page 9: ...S until snug without over tightening them TIPS 1 When initially inserting the CONNECTING PINS in place you might want to firmly tap the pin in place You ensure a firm initial grip of the shaft threads...

Page 10: ...e below configurations IMPORTANT NOTIONS Always keep the rear entry point of the JETROLL free for it to sink freely when the PWC is climbing onto the system For multiple units assembled LINK KITS may...

Page 11: ...ay or may not apply and some alterations of the below accessories techniques may also be involved in the process The below list aims at covering as many of the possible scenarios If the Jetroll system...

Reviews: