background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

3. Water heater installation

Mounting the appliance

- fix the wood screw of the support bracket 395 mm above the centreline of the water outlet
- remove the gas control knob 

(fig. 2) pulling it towards you

- remove the four screws "V" (fig. 10) securing the case

- remove the case

- position the appliance, engaging the slot cut in the chassis on the support bracket (fig. 4).

9

395

EF

Water axes

Fig. 4

4

Connections

The appliance is delivered complete, ready to install. The

accessories pouch contains the following items :

Natural gas connection

(fig. 5) 

:

-  one  valve 

Ø  3/4"  F  /  Ø  1/2"  M  with 

1/2" gasket
- one brazed angle socket 

Ø 14 x 0,75 with nut

and gasket.

Cold water connection

(fig. 6)

:

- one M16 union 

, one 1/2 nut 

, two gaskets

, one valve 

Ø 1/2" M / Ø 1/2" M, one water

filter 

(with built-in mixer AMI only).

Hot water connection

(fig. 5)

:

- one blanking disc with 3/8" nut and gasket or one
tube 

Ø 12 x 1 with 3/8" nut and gasket.

23

20

19

18

17

16

15

14

Fig. 5

14

23

22

15

Fig. 6

16

18

17

19

20

18

Important :

Clean the inside of the water and gas pipes of the installation thoroughly before connecting the appliance.

Summary of Contents for CELT STAR C

Page 1: ...s one piece case the water heater comprises One piece chassis made of protected steel sheet Deflector Heat exchanger made of protected copper Combustion chamber Multi gas burner made of stainless stee...

Page 2: ...bar 3 lb in2 Minimum water pressure to operate the low pressure valve 0 1 bar 1 5 lb in2 Maximum normal pressure water pressure with governor 10 bar 145 lb in2 Maximum low pressure water pressure with...

Page 3: ...rised contractor Installation pipes should be fitted in accordance with BS 6891 Pipework from the meter must be of adequate size Pipes of a smaller size than the gas connection should be not used The...

Page 4: ...appliance is delivered complete ready to install The accessories pouch contains the following items Natural gas connection fig 5 one valve 3 4 F 1 2 M with 1 2 gasket one brazed angle socket 14 x 0 75...

Page 5: ...refer to the Technical characteristics In the case of a higher supply pressure the maximum gas power can be adjusted by proceeding as follows detach the stop from the fascia fig 7a place it on the ga...

Page 6: ...the gas control knob 6 Fig 10 6 Controls and use Fig 11 Control panel fig 11 Gas control knob symbols Off Reduced power Pilot ignition Intermediate piezo triggering powers Pilot position Maximum power...

Page 7: ...fitted with a system enabling the user to limit its maximum power To do this turn the knob until it is between the and This appliance operates in such a way that it can be used over a wide range of f...

Page 8: ...thout being connected to a flue After shutdown the water heater is in the safety position After approximately five minutes it can be turned on again manually following the normal lighting procedure If...

Reviews: