background image

8  

Installing Tubing Into Fittings 

Push the tube into the fitting and up to the tube stop  

Pull on the tube to check that it is secure. Test the system before use. 

Cut the tube square and remove burrs and sharp edges.  Ensure that the 
outside diameter is free from score marks.  For soft or thin walled plastic 

tubing we recommend the use of a tube insert. 

Step 1

 

Step 2

 

Step 3

 

Installing Tubing Connections 

With  all  components  in  place,  complete  final  tubing 
connections using these guidelines: 

 

 

Tubing should follow contour of the cabinets 

 

Cut tubing to desired length using square cuts and 

proper cutting device 

 

Make no sharp bends 

 

Keep  tubing  from  the  post-filter  to  the  faucet  as 
short as practical for good flow. 

 

Leave enough tubing that the system can easily be 

pulled out from the cabinet for easy filter changes. 

 

Procedure (Standard Faucet) 

 

Follow  the  directions  on  the  labels  installed  on  the 

tube fittings. 

1.  Connect 3/8” tubing to faucet. 
2.  Connect ¼” tubing to drain saddle. 

3.  Connect 3/8” tubing storage tank. 

4.  Connect  ¼”  tubing  to  inlet  water  supply  valve.  

(For air gap models connect 1/4” tubing to faucet 

and 3/8” tubing from faucet to drain saddle) 

5.  Check all connections to be sure they are secure. 
6.  Turn on feed water valve and check for leaks. 

Sanitize System 

Sanitize the System (Recommended)

 

 

Sanitizing  is  recommended  immediately  after  installation  of  the  Reverse  Osmosis  system.  It’s  also  recom-

mended after servicing inner parts. It is important that the person installing or servicing the system have clean 

hands while handling inner parts of the system. 
 

1.  Turn off the water supply to the RO system and close the ball valve on the storage tank. 

2.  Open the RO faucet. 
3.  Use an eyedropper (not included) and common household bleach (5.25%). 

4.  Add 3 ml (1 teaspoon) of bleach into open end of 3/8 tube connected to tank.  Handle bleach according to 

bleach manufacturer’s recommendations.  

5.  Connect tubing back to tank ball valve.  

6.  Sanitizing the system will be completed during the Flush System and Check Operation steps on the follow-

ing page. 

Note: The bleach must be removed from the system before drinking the water. See Flush System 
instructions on the next page. 

Summary of Contents for RO 75 GPD 4 STAGE BP

Page 1: ...COMMENDED TO WAIT UNTIL THE ENTIRE SYSTEM IS PRESSURIZED INCLUDING STORAGE TANK FAUCET AND RE CHECK FOR ANY LEAKS BEFORE LEAVING INSTALLATION SITE IT IS NORMAL FOR SOME BLACK CARBON FINES TO APPEAR IN...

Page 2: ...ms use four stages of treatment to filter your water Stage 1 Remove sand dirt sediment Stage 2 Remove chlorine taste odors very fine particulates Stage 3 Reduce total dissolved minerals Stage 4 Polish...

Page 3: ...em can be installed to provide the feed water for these features but you should consult your fridge owners manual for further information Guidelines for component placement are as follows Faucet shoul...

Page 4: ...ered water ready for use Faucet Standard used to dispense RO water when needed Optional air gap and designer faucets are available Post Carbon Filter is provided for a final polish to provide great ta...

Page 5: ...ank Failure to do so could result in a leak that is not spotted until after the installer has left the loca tion Installing the Membrane When handling membranes be sure hands are clean and sanitized o...

Page 6: ...oves eye protectors To make the faucet mounting hole if sprayer or second hole is not used check below to make sure the drill does not interfere with anything below the sink Center punch a small inden...

Page 7: ...f the floor Level it and mark the loca tion of mounting screws 2 Install the screws Leave 1 4 of the screw head out from the wall 3 Install the mounting bracket slots over the screws and hang the unit...

Page 8: ...nnect 3 8 tubing storage tank 4 Connect tubing to inlet water supply valve For air gap models connect 1 4 tubing to faucet and 3 8 tubing from faucet to drain saddle 5 Check all connections to be sure...

Page 9: ...aks 3 Allow system to process water for approximately 1 hour at which point tank will be practically full 4 Open faucet again and allow tank to empty for a second time It is normal to see some black c...

Page 10: ...bing into fitting 2 Defective tubing 2 Cut damage section of tubing and re install Not enough product water Pump not running Pump running but system not producing water Leaks Spare Parts List RO 75 GP...

Page 11: ...NE HOUSING PP 1 22 41203005 CONTROLLER 1 23 41323002 LARGE SINGLE CLAMP PP 2 24 41209004 SOLENOID VALVE 420ML MIN 1 25 41317002 CONTROL BOX pp 1 26 42005016 PRODUCT WATER CHECK VALVE 3 8 O D 3 8 O D 1...

Page 12: ...ce any part which fails two 2 years from date of manufacture as indicated by the serial number or date code provided the failure is due to a defect in material or workmanship The only exception shall...

Reviews: