| 20
EN-Rev IM/GN-BM-EU/1.93 Copyright © August, 2021. CSI Solar Co., Ltd.
www.csisolar.com
6.4 MOUNTING METHODS (SINGLE-AXIS TRACKER)
The bolts and clamps used in this section should follow
the requirements in 6.1 and 6.2.
Under any conditions the junction box should not
become in contact with the subjacent racking structure
except for the torque tube under high loading. If any
racking structures, especially bearing house, have to be
located under the modules, any racking structure shall
not higher than frame C side.
If your tracker design cannot meet the above distance
requirement, please contact Canadian Solar technical
support department in writing for advice.
Tracker 1P Bolting method
Install and tighten the module clamps to the mounting
rails using the torque stated by the mounting hardware
manufacturer. M6 X 1 (1/4”) bolt and nut are used for
this bolting method.
Tightening torques should be 6~9 Nm (4.5~6.6 ft-lbs)
M6 X 1 (1/4”) coarse thread bolts, depending on bolt
class.
Module
type
Mounting
hole space
(mm)
Fixed
mounting
hole
location
Plain
washer
outer
diameter
(mm)
Distance H
(mm)
Test load
(Pa)
CS3W-PB-AG
CS3W-MB-AG
A1-A3: 400
B1-B3: 1155
A1, A2, A3, A4
16
<80
+2400/-2400
A1, A2, A3, A4
B1, B2, B3, B4
16
≥80
+3000/-2800
CS3Y-PB-AG
CS3Y-MB-AG
A1-A3: 400
B1-B3: 790
A1, A2, A3, A4
16
<80
+2400/-2200
A1, A2, A3, A4
B1, B2, B3, B4
16
≥80
+2800/-2800
CS6W-MB-AG
A1-A3: 400
B1-B3: 790
A1, A2, A3, A4
16
<80
+2000/-1800
B1, B2, B3, B4
16
≥80
+2400/-2200
CS7L-MB-AG
A1-A3: 400
B1-B3: 790
A1, A2, A3, A4
16
<80
+2400/-2100
B1, B2, B3, B4
16
≥80
+2800/-2100
CS7N-MB-AG
A1, A2, A3, A4
16
<80
+2400/-2100
B1, B2, B3, B4
16
≥80
+2600/-2100