ProtoCessor 1991 Tarob Court Milpitas, California 95035 USA Web:
Tel: (408) 964-4444 Fax: (408) 964-4425 email: [email protected]
Camus ProtoNode Startup
G id
Page 81 of 87
566
Heat exchanger T-rise wasn't allowed due to stack limit setting
567
Heat exchanger T-rise wasn't allowed due to stack connector setting
568
Outlet T-rise wasn't allowed due to outlet connector setting
569
T-rise delay was not configured for recycle response
570
Heat exchanger high limit setpoint was out of range
571
Heat exchanger high limit response was invalid
572
Heat exchanger high limit was exceeded
573
Heat exchanger high limit wasn't allowed due to stack limit setting
574
Heat exchanger high limit wasn't allowed due to stack connector setting
575
Heat exchanger high limit delay was not configured for recycle response
576
CH pump output was invalid
577
DHW pump output was invalid
578
Boiler pump output was invalid
579
Auxiliary pump output was invalid
580
System pump output was invalid
581
Mix pump output was invalid
582-589
RESERVED
590
DHW plate preheat setpoint was invalid
591
DHW plate preheat ON hysteresis was invalid
592
DHW plate preheat OFF hysteresis was invalid
593
Tap detect degrees was out of range
594
Tap detect ON hysteresis was invalid
595
Inlet - DHW tap stop degrees was out of range
596
Outlet - Inlet tap stop degrees was out of range
597
DHW tap detect on threshold was invalid
598
DHW plate preheat detect on threshold was invalid
599
DHW plate preheat detect off threshold was invalid
600
Delta T inlet temperature was invalid
601
Delta T outlet temperature was invalid
602
Delta T exchanger temperature was invalid
603
Parameter PCB was switched to backup
604
Range PCB was switched to backup
605
Lead Lag ODR boost max offpoint temperature was invalid
606
Lead Lag ODR boost max offpoint temperature was too low
607
Mix ODR boost max offpoint temperature was invalid
608
Mix ODR boost max offpoint temperature was too low
609
Time to rotate lead boiler to next firing slave
610
Time to rotate lead boiler to next available slave
611
Time to rotate lead boiler to first firing slave in order
612
Time to rotate lead boiler to lowest running slave
613
Lead boiler was rotated based on new firing sequence order
614
Lead boiler was rotated based on measured run time
615
Parameter PCB was switched to backup
616
Range PCB was switched to backup
617
Lead Lag steam pressure was invalid
618
Lead Lag steam setpoint was invalid
619
Lead Lag steam OFF hysteresis was invalid
620
Lead Lag steam ON hysteresis was invalid
621
Lead Lag steam minimum pressure was invalid
622
Lead Lag modulation sensor was not valid with setpoint source