
42
Rotation schedule adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Standard rotation schedule is
based on equalizing run time
on a 1-hour schedule
•
To vary the rotation to a
fixed schedule based on
(hours, days)
1)
Press
and
2)
Press
[Lead Lag Master Configuration]
3)
Press
[Advanced Settings >]
4)
Press the to arrive at
Algorithms
5)
Select
Lead selection method: Sequence order
6)
Select
Lag selection method: Sequence order
7)
Select
Lead rotation time: (user defined)
Base load rate adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Upon a call for heat the lead
boiler will fire to the
specified base load rate
(80%). If the temperature is
not within Error threshold
(5
o
F) of setpoint after
Interstage delay (2 minutes)
a lag boiler will be brought
online and will also fire at the
base load rate specified.
•
Modulation of boilers will
only occur after all boilers in
the Lead Lag system are
firing at the specified base
load rate (80%).
1)
Press
and
2)
Press
[Lead Lag Master Configuration]
3)
Press
[Advanced Settings >]
4)
Press the to arrive at
Rate Allocation
5)
Select
Base load common: (user defined)
Summary of Contents for Dynaforce Series
Page 2: ...99 0171 REV 0 9...
Page 35: ...35...
Page 48: ...48...
Page 67: ...67 PART 12 EXPLODED VIEW 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20...
Page 68: ...68 21 22 23 24 26 35 34 33 32 31 30 29 28 27 25 36 37 38 39 40 42 43 56...
Page 75: ...75 PART 13 ELECTRICAL DIAGRAMS...
Page 76: ...76...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79...