
38
Slave Boiler
Description
Electrical Connection(s)
Programming Instructions
•
Slave boiler lead lag setup
1)
Place toggle switch to
LOCAL
2)
Press
and
3)
Select
System Identification & Access
4)
Verify
Modbus address
. To be in sequential order
5)
Select
Lead Lag Slave Configuration
6)
Select
Slave Enabled = Enable slave for built-in Lead Lag master
The following steps are performed at the factory and verifying on site
will be sufficient:
7)
Select
Pump Configuration
8)
Press
[Advanced Options >>]
9)
Press the to arrive at
Central Heat Pump
or
DHW Pump
10)
On Options: Local burner demand
11)
On Options: Local Lead Lag Service Active
12)
Force On: Outlet high limit
Summary of Contents for Dynaforce Series
Page 2: ...99 0171 REV 0 9...
Page 35: ...35...
Page 48: ...48...
Page 67: ...67 PART 12 EXPLODED VIEW 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20...
Page 68: ...68 21 22 23 24 26 35 34 33 32 31 30 29 28 27 25 36 37 38 39 40 42 43 56...
Page 75: ...75 PART 13 ELECTRICAL DIAGRAMS...
Page 76: ...76...
Page 77: ...77...
Page 78: ...78...
Page 79: ...79...