SECTION 1.  WEATHER STATION DESCRIPTION AND INSTALLATION

1-10

The two leads from the charging source can be
inserted into either of the CHG ports, polarity
doesn't matter. A transzorb provides transient
protection to the charging circuit.  A sustained
input voltage in excess of 40V will cause the
transzorb to limit voltage.

CAUTION: Switch the power to "off" before
disconnecting or connecting the power
leads to the Wiring Panel.  The Wiring
Panel and PS12-LA are at power ground.  If
12V is shorted to either of these, excessive
current will be drawn until the thermal fuse
opens.

Do not use the external port, labeled EXT, with
the PS12-LA.

TABLE 1.5-1.  PS12-LA Battery and AC

Transformer Specifications

Lead Acid Battery
Battery Type

Yuasa NA 7-12

Float Life @ 25

o

C

5 years typical

Capacity

7.0 amp-hour

Shelf Life, full charge

Check twice yearly

Charge Time (AC Source)

40 hr full charge,
20 hr 95% charge

AC Transformer
Input: 

120V AC, 50/60 Hz

Isolated Output: 

16 VAC @ 350 mA
max.

There are inherent hazards associated with the
use of sealed lead acid batteries. Under normal
operation, lead acid batteries generate a small
amount of hydrogen gas.  This gaseous by-
product is generally insignificant because the
hydrogen dissipates naturally before building-up
to an explosive level (4%) occurs.  However, if
the batteries are shorted, or overcharging takes
place, hydrogen gas may be generated at a rate
sufficient to create a hazard.  Campbell
Scientific makes the following
recommendations:

1.  A CR10 equipped with standard lead acid

batteries should NEVER be used in
applications requiring INTRINSICALLY
SAFE equipment.

2.  A lead acid battery should not be housed in

a gas-tight enclosure.

1.5.2  SOLAR PANEL

The solar panel is mounted above the
datalogger enclosure facing south (Figure 1.6-
1).  The lead wire is routed through the
enclosure base and connected into the two
terminals on the PS12-LA labeled CHG.
Polarity does not matter (Figure 1.5-1).  When
the solar panel is connected in, the red LED
light should light, indicating that the batteries are
being charged.

1.6  SENSOR WIRING

Figure 1.3-2 shows how sensor lead wires are
routed through the crossarm and cover.  Route
sensor wires through the center hole of the
crossarm, down the mast, and into the base of
the enclosure.

NOTE:  The solar radiation sensor has a
large end on the cable.  Wire it into the
enclosure first.

Connect sensor wires to the CR10WP wiring
panel as shown in Figure 1.6-2.

Once all wiring is completed, use electricians
putty to seal the cable entry hole.

1.7  STATION GROUNDING

Proper grounding of the station minimizes
damage from electrical transients.

A ground lug is provided at the base of the
enclosure (Figure 1.3-1).  Everything inside the
enclosure is grounded to the ground lug.  A 14
awg or larger ground wire should be run from
the enclosure ground lug to earth ground.  The
weather station mast should also be connected
to earth ground (Figure 1.7-1).

Summary of Contents for NW8002

Page 1: ...NW8002 WEATHER STATION INSTALLATION INSTRUCTION MANUAL REVISION 3 97 COPYRIGHT c 1991 1997 CAMPBELL SCIENTIFIC INC...

Page 2: ...antability or fitness for a particular purpose CAMPBELL SCIENTIFIC INC is not liable for special indirect incidental or consequential damages Products may not be returned without prior authorization T...

Page 3: ...HOOTING 3 1 3 1 Communication Testing 3 1 3 2 Sensors 3 3 3 3 Datalogger 3 5 FIGURES 1 2 1 Effect of Structure on Wind Flow 1 2 1 3 1 NW8002 Enclosure with RAD Connection 1 3 1 3 2 NW8002AC SP Weather...

Page 4: ...Probe Assembly 2 3 3 1 1 RAD Testing Computer End 3 1 3 1 2 RAD Testing Datalogger End 3 2 3 2 1 4831 Temperature Relative Humidity Probe Assembly 3 5 TABLES 1 2 1 Approximate Range Miles 1 1 1 5 1 P...

Page 5: ...0 C Operating relative humidity range 0 to 100 non condensing SENSOR SPECIFICATIONS Temperature Range 35 C to 48 C Accuracy 4 C typically better than 2 C Relative Humidity Range 12 97 RH Accuracy 5 Wi...

Page 6: ...anted earth This allows the temperature and humidity readings to closely correspond with that of the turf the ET value is to represent 3 The radiation shield that covers the probe provides protection...

Page 7: ...ne modem for use with Mir 5000 systems only Figure 1 9 1 PS12 LA 12 V Rechargeable Battery Sensors Figure 1 3 2 4776 Li Cor Solar Radiation Sensor 6575 HMP35C Temperature and RH Probe 4830 Texas Elect...

Page 8: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 3 FIGURE 1 3 1 NW8002 Enclosure with RAD Connection...

Page 9: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 4 FIGURE 1 3 2 NW8002AC SP Weather Station Cross Arm Detail...

Page 10: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 5 FIGURE 1 3 3 NW8002AC Weather Station...

Page 11: ...ft Channel up Step 3 Mount the wind set on the left side Mount the wind set so that the wind speed is on the side closest to you Step 4 Mount the solar radiation and rain gage sensors on the opposite...

Page 12: ...1 7 FIGURE 1 4 1 NW8002 Cement Base FIGURE 1 4 2 NW8002 Tower with Tilt Base...

Page 13: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 8 FIGURE 1 4 3 NW8002AC SP Weather Station Top View FIGURE 1 4 4 Plumbing NW8002 Tower...

Page 14: ...mits current from the battery and provides circuitry to connect an external 12 volt battery The terminals on the PS12 are exposed by unscrewing the two set screws as shown in Figure 1 5 1 The two 12 v...

Page 15: ...gas may be generated at a rate sufficient to create a hazard Campbell Scientific makes the following recommendations 1 A CR10 equipped with standard lead acid batteries should NEVER be used in applic...

Page 16: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 11 FIGURE 1 6 1 NW8002SP Weather Station...

Page 17: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 12 FIGURE 1 6 2 NW8002 Weather Station Sensor Connection...

Page 18: ...modems Installation is as follows 1 Select a direct burial cable with two twisted pairs Two recommended types of cable are Two Cables Toro shielded armored cable P 7162 D A 1 or Anixter F 02P22BPN Rod...

Page 19: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 14 FIGURE 1 8 1 RAD Modem Connection and Grounding...

Page 20: ...the computer site to communicate with the weather station The DC112 comes from the factory connected to the datalogger inside the enclosure Figure 1 9 1 The burial phone cable is routed through the b...

Page 21: ...SECTION 1 WEATHER STATION DESCRIPTION AND INSTALLATION 1 16 FIGURE 1 9 1 NW8002 Enclosure with DC112 Phone Modem Option Use with MIR 5000 Systems Only...

Page 22: ...2 1 Look for possible cable damage on any sensors and record all inspection findings in log section 2 4 2 2 MONTHLY 2 2 1 RAIN GAGE Check the rain gage funnel and tip mechanism Be sure screen inside f...

Page 23: ...pes of Temperature Relative Humidity Sensors which you may have Refer to the cleaning procedures for your particular system below 2 3 2 TEMPERATURE RELATIVE HUMIDITY SYSTEMS SHIPPED AFTER JANUARY 1 19...

Page 24: ...screen off and thoroughly clean the screen DO NOT TOUCH THE RELATIVE HUMIDITY CHIP Remember that while the sensor is rugged the function of it is to sense water vapor in the air therefore careful han...

Page 25: ..._ _____ ____________________________ _____ ____________________________ _____ ____________________________ _____ ____________________________ _____ ____________________________ _____ _________________...

Page 26: ...____________________ _____ ____________________________ _____ ____________________________ _____ ____________________________ 2 TO 3 MONTH Rain Gage Inspect and clean if necessary Date OK Comments ___...

Page 27: ...spect and spin each sensor Date OK Comments _____ ____________________________ _____ ____________________________ _____ ____________________________ _____ ____________________________ _____ __________...

Page 28: ...sor leads for damage or corrosion Also check leads at terminal strip of datalogger to be sure that leads are securely fastened b Use circuit diagrams in Appendix and Section 2 3 to ohm out defective s...

Page 29: ...ill has not been established go to Sections 3 1 thru 3 3 to test the datalogger If the datalogger test passes then the SC932 is suspect and will need to be repaired or replaced 3 1 2 TESTING THE SC95C...

Page 30: ...circuits Section 3 2 1 or the CR10KD Keyboard Display can be connected to the CR10 to check sensor reading values Section 3 3 1 Table 2 1 3 2 1 OHM METER TESTS OF SENSORS All sensors that are to be c...

Page 31: ...f you are suspecting improper readings and if facilities exist the temperature and relative humidity probe should be placed in a sealed container over deionized water for two hours After two hours it...

Page 32: ...OTE Contact your Toro distributer for RH chip replacement 3 3 DATALOGGER CR10 The CR10 is the heart of the weather station it measures the sensors outputs and converts the measurements to engineering...

Page 33: ...CR10 Temperature and 10 Battery Voltage If the datalogger is not operating properly the CR10 Temperature will not record a reasonable value The battery voltage should read no less than 11 76 volts If...

Page 34: ...A 1 APPENDIX A SENSOR SCHEMATICS...

Page 35: ...APPENDIX A SENSOR SCHEMATICS A 2...

Page 36: ...APPENDIX A SENSOR SCHEMATICS A 3...

Page 37: ...APPENDIX A SENSOR SCHEMATICS A 4...

Page 38: ...APPENDIX A SENSOR SCHEMATICS A 5...

Page 39: ...APPENDIX A SENSOR SCHEMATICS A 6...

Reviews: