CR10 OVERVIEW
OV-15
datalogger is powered-up, requiring only that
the clock be set.
The program on power up function can be
achieved by using a SM192/716 Storage
Module. Up to 8 programs can be stored in the
Storage Module, the programs may be
assigned any of the numbers 1-8. If the
Storage Module is connected when the CR10 is
powered-up the CR10 will automatically load
program number 8, provided that a program 8
is loaded in the Storage Module (Section 1.8).
OV5. PROGRAMMING EXAMPLES
We will start with a simple programming
example. There is a brief explanation of each
step to help you follow the logic. When the
example uses an instruction, find it on the
Prompt Sheet and follow through the
description of the parameters. Using the
Prompt Sheet while going through these
examples will help you become familiar with its
format. Sections 9-12 have more detailed
descriptions of the instructions.
Connect the CR10 to either a CR10KD
Keyboard/Display or a terminal (Section OV2).
With the Wiring Panel connected to the CR10,
hook up the power leads as described in
Section OV1.2. If using a terminal, use the 7H
command to get into the Remote Keyboard
State (Sections 5.2). The programming steps
in the following examples use the keystrokes
possible on the keyboard/display. With a
terminal, some responses will be slightly
different.
If the CR10KD is connected to the CR10 when
it is powered up, the display will show:
Display
Explanation
HELLO
On power-up, the CR10
displays "HELLO" while it
checks the memory (this
display occurs only with the
CR10KD).
after a few seconds delay
:96
The size of the machine's total
memory (RAM plus 32 K of
ROM), in this case 96K
Summary of Contents for CR10 PROM
Page 2: ...This is a blank page ...
Page 4: ...This is a blank page ...
Page 9: ...CR10 TABLE OF CONTENTS v LIST OF TABLES LT 1 LIST OF FIGURES LF 1 INDEX I 1 ...
Page 10: ...CR10 TABLE OF CONTENTS vi This is a blank page ...
Page 14: ...CR10 OVERVIEW OV 2 ...
Page 15: ...CR10 OVERVIEW OV 3 FIGURE OV1 1 1 CR10 and Wiring Panel ...
Page 16: ...CR10 OVERVIEW OV 4 FIGURE OV1 1 2 CR10 Wiring Panel Instruction Access ...
Page 17: ...CR10 OVERVIEW OV 5 ...
Page 34: ...CR10 OVERVIEW OV 22 ...
Page 35: ...CR10 OVERVIEW OV 23 FIGURE OV6 1 1 Data Retrieval Hardware Options ...
Page 36: ...CR10 OVERVIEW OV 24 OV7 SPECIFICATIONS ...
Page 37: ...CR10 OVERVIEW OV 25 ...
Page 38: ...CR10 OVERVIEW OV 26 ...
Page 51: ...SECTION 1 FUNCTIONAL MODES 1 13 This is a blank page ...
Page 53: ...2 2 ...
Page 62: ...SECTION 3 INSTRUCTION SET BASICS 3 6 ...
Page 63: ...SECTION 3 INSTRUCTION SET BASICS 3 7 ...
Page 68: ...SECTION 3 INSTRUCTION SET BASICS 3 12 This is a blank page ...
Page 74: ...SECTION 4 EXTERNAL STORAGE PERIPHERALS 4 6 ...
Page 88: ...6 5 FIGURE 6 6 1 Addressing Sequence for the RF Modem ...
Page 110: ...SECTION 7 MEASUREMENT PROGRAMMING EXAMPLES 7 17 FIGURE 7 16 2 Well Monitoring Example ...
Page 132: ...SECTION 8 PROCESSING AND PROGRAM CONTROL EXAMPLES 8 13 This is a blank page ...
Page 197: ...SECTION 13 CR10 MEASUREMENTS 13 18 FIGURE 13 5 1 Circuits Used with Instructions 4 9 ...
Page 203: ...SECTION 13 CR10 MEASUREMENTS 13 24 This is a blank page ...
Page 215: ...SECTION 14 INSTALLATION AND MAINTENANCE 14 12 This is a blank page ...
Page 218: ...APPENDIX A GLOSSARY A 3 and computers in a terminal mode fall in this category ...
Page 220: ...APPENDIX A GLOSSARY A 5 This is a blank page ...
Page 228: ...APPENDIX C BINARY TELECOMMUNICATIONS C 6 This is a blank page ...
Page 230: ...This is a blank page ...
Page 232: ...This is a blank page ...
Page 234: ...APPENDIX G CHANGING RAM OR PROM CHIPS G 2 FIGURE G 1 Disassembling CR10 ...
Page 236: ...APPENDIX G CHANGING RAM OR PROM CHIPS G 4 FIGURE G 3 Jumper Settings and Locations ...
Page 237: ...APPENDIX G CHANGING RAM OR PROM CHIPS G 5 This is a blank page ...