EMC_SPEC040_CLCR.doc
Rev. E
–
2021 10 18
35/63
Install & Operating Manual
CleanSeal V3
Adapting and Operating the Control Box Locking System
The Control Box locking system allows for quick operation with a single screw inside the box.
➔
Locking system capability
for
panel thickness
min
40 mm
max
220 mm
➔
For panels < 100 mm, use spacer blocks in the back of the panel :
Choose spacer material and fixing technology according to the panel.
The spacer will receive only compression forces, it may be fixed to the wall by double-sided tape.
Other panel thicknesses or customized locking solutions may be possible, subject to project-specific
feasibility study and quotation.
➔
Please contact your Camfil representative
Control box
Clamping bar
Clamping stops (4)
Main rod
Positioning nuts (2)
Compression nuts (2)
Stop rod (2)
Stop rod nuts (4)
Delivery state
Adjust & cut
In case of border values,
use the smaller spacer !
e.g.
50 mm
➔
50 mm spacer
Spacer
[mm]
Panel
Thickness
[mm]
none
100 - 200
10
90 - 100
20
80 - 90
30
70 - 80
40
60 - 70
50
50 - 60
60
40 - 50