- -
6
7
8 9
:
& &
E
A
W
V
U
W
V
U
Pa
g.
88
- M
an
u
al
c
od
e:
11
9
D
S
5
1
11
9
D
S
5
1
ve
r.
4
.0
4.
0
0
3
/2
0
0
9 © C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. - T
h
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to
c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
For the electrical connection procedures, use the junction box and branching boxes.
5.6 Connecting to the control panel
ZA3N / ZM3E Control panel
Connecting the 230V a.c. delayed opening
gearmotor.
Connecting the 230V a.c. delayed closing gearmotor.
Power supply
230V a.c. - 50/60 Hz
5.7 Outward opening installation
Gate leaves up to 3 m (KR3)
Opening
A
(mm)
B
(mm)
E
(mm)
90°
130
130
910
Weld the extra bracket to that of the pillar,
secure the extra bracket to the pillar
making sure the A and B quotas are met
as shown in the table.
Open the gate to a 90° arc, weld or
secure using proper screws the gate
bracket making sure the E quota is met.
Secure the gearmotor to the brackets.
Gate leaves up to 5 m (KR5)
Opening
A
(mm)
B
(mm)
E
(mm)
90°
130
130
1310
Extra bracket