p.
1
8
18
- M
an
u
al
c
od
e:
F
A
0
1
0
3
8
-E
N
FA
0
1
0
3
8
-E
N
v.
11
- 0
1/
2
0
18 - © C
am
e S
.p.
A
. - T
h
e m
an
u
al
's c
onte
nts m
ay b
e e
d
ite
d at a
ny ti
m
e w
ith
ou
t n
oti
ce
.
To correct the horizontal position:
- raise the boom;
- turn the mechanical closing stop clockwise to increase the boom travel or counter clockwise to reduce it
.
Fasten the stop with a counter nut
.
Establishing the endstop points
Close the inspection hatch and power up the system. Activate the barrier to check whether the boom is parallel to the road surface when closed
and at about 89° when open.
⚠
The boom's opening and closing maneuvers must be performed with the inspection hatch closed.
To correct the boom's vertical position:
- lower the boom;
- open the inspection hatch;
- turn the opening mechanical stop clockwise to increase the boom's travel or counter clockwise to reduce it
.
Fasten the stop with a counter nut
.