Tools and materials
Make sure you have all the tools and materials you will need for installing in total safety and in compliance with applicable regulations. The figure
shows some of the equipment installers will need.
Connection
Cable type
Cable length
1 < 10 m
Cable length
10 < 20 m
Cable length
20 < 30 m
Power supply 230 V AC
FROR CEI
20-22
CEI EN
50267-2-1
3G x 1.5 mm2
3G x 2.5 mm2
3G x 4 mm2
Flashing light
2 x 0.5 mm2
-
-
Photocell transmitters
2 x 0.5 mm2
Photocell receivers
4 x 0.5 mm2
Command and safety device
2 x 0.5 mm2
Antenna
RG58
max 10 m
Paired or CRP (Came Remote Protocol)
UPT CAT 5
max 1000 m
Metal mass detector
(see product literature)
If cable lengths differ from those specified in the table, establish the cable sections depending on the actual power draw of the connected
devices and according to the provisions of regulation CEI EN 60204-1.
For multiple, sequential loads along the same line, the dimensions on the table need to be recalculated according to the actual power draw and
distances. If connecting products that are not contemplated in this manual, see the literature accompanying said products
Cable types and minimum thicknesses
INSTALLATION
⚠
The following illustrations are mere examples. Consider that the space available where to fit the barrier and accessories will vary depending
on the area where it is installed. It is up to each installer to select the most suitable solution.
⚠
Warning! Use hoisting equipment to transport and position the barrier.
During the set up and installing stages the barrier could be unstable and tip over. So, be careful to not lean on it until it is completely fastened.
Preparing the fastening plate.
⚠
If the flooring does not allow for a sturdy fastening of the entry unit, you will have to set up a cement slab.
Dig a hole for the foundation frame.
Set up the corrugated tubes needed for making the connections coming out of the junction pit.
The number of tubes depends on the type of system and the accessories you are going to fit.