67
67
160
100
60
3
Fig.2
Fig.3
Fig.4
DX
SX
Fig.4-1
Fig.4-2
A
B
C
C
B
A
SX
DX
Pa
g.
5
- M
an
u
al
c
od
e:
11
9
A
U
3
5
11
9
A
U
3
5
ve
r.
1.
0
1.
0
0
8
/2
0
10 © C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. - T
h
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to
c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
5.5 Assembly diagram
5.6 Installing the unit
- Check the effi
ciency of both moving and non-moving parts on the structure that will be supporting the operator;
- Determine, depending on the type of supporting structure and desired opening, the exact position of the motor assembly by following
the standard applications shown;
- Set up a closing end stop and an opening end stop (fi g. 4, p. 5).
- Dig, depending on the size of the assembly, a foundation pit in the chosen spot (Fig. 3);
- Prepare a drainage system in the foundation, to drain away any water leaks which may cause oxidation (fi g 3 – part.1);
- The foundation box makes for quick and easy setting up of the assembly. Place it inside the pit with the pin aligned to the upper hinge
(Fig. 3 – part. 2), sink it into the cement (Fig. 3 – part. 3) making sure it is perfectly levelled and that the upper edge is 3mm above
ground level (Fig. 3 part. 4);
- Plan for the route of the electrical cables according to the command and safety instructions using the apposite hole on the box (Fig.
3 – part. 5);
- Grease the rotation pins of the foundation box and the gate attachment lever; the hinge and pin lever must be aligned;
- Position the gate leaf between the upper hinge and the pin lever; the hinge and pin lever must be aligned;
- Secure the pin lever to the gate leaf, by welding spots 3 to 4 cm apart along the contact surface. Avoid any welding near the threaded
screws (Fig. 3 – Part. 6).
- Screw the M10 x 100 (A) and the M10 (B) bolt onto the gearmotor
arm as shown in fi g. 4-1 (RIGHT HAND installation) and fi g. 4-2
N(LEFT HA D installation);
- Affi
x the gearmotor to the foundation box using the threaded pins
and securing it using the provided bolts and washers;
- Insert the (C ) transmission lever between the motor arm and the
box lever and electronically shut the gate against the closing end
stop.
Adjust screw (A) until it touches the (C) transmission lever.
- When testing, adjust the screw so as to allow proper closing
pressure of the gate leaf and allow its re-hooking during the
mechanism’s release procedure.
- Once adjustment is complete, secure the (B) nut.