500
500
650
24h
67
Pa
ge
66
- M
an
u
al
c
o
d
e:
FA
0
11
8
2
-E
N
FA
01
18
2-
E
N
ver
.
11
0
5
/2
0
1
8 © C
A
M
E
S
.p.
A
. - T
h
e d
at
a a
n
d i
n
fo
rm
at
io
n p
ro
vi
d
ed
in
t
h
is
m
an
u
al
a
re s
u
b
je
ct t
o c
h
an
g
e a
t a
n
y t
im
e w
it
h
ou
t p
ri
or n
ot
ic
e b
y C
A
M
E
S
.p.
A
.
INSTALLATION
⚠
The following illustrations are only examples, given that the space for securing the operator and accessories varies depending on the overall dimensions. The
installation technician is responsible for choosing the most suitable solution.
The following drawings refer to a standard installation of an inward opening gate.
Laying the corrugated pipes and inspection chambers
Make the hole for the box.
Prepare the junction boxes and corrugated pipes necessary for connection to the inspection chamber and the drain pipe.
The number of tubes depends on the type of system installed and any accessories.
Installing the foundation box
Lean the box against the pillar making sure that the corrugated pipes and the drain pipe pass through the designated holes.
Fill the hole with concrete.
Position the box level with the ground and place the pin in line with the upper gate hinge. Wait at least 24h to cure.
Clean any remaining concrete from inside the box.
Summary of Contents for FROG-A
Page 49: ...FROG A FROG AV FROG AE FA01182 RU RU...
Page 54: ...500 500 6 5 0 24h 67 6 6 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A 24...
Page 55: ...7 7 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A...
Page 56: ...12 UNI 6592 8 8 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A...
Page 57: ...9 9 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A 110...
Page 60: ...12 12 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A...
Page 61: ...13 13 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A 6...
Page 63: ...15 15 FA01182 RU FA01182 RU 1 1 05 2018 CAME S p A CAME S p A CAME S p A UNI EN ISO 14001...