23
PLEASE CHECK THAT YOU HAVE CORRECTLY:
Ref Page
1. SET POWER SETTING, SET DIPSWITCHES FOR
COMMISSIONING, ENSURE WIRE LINK
IS FITTED BETWEEN TERMINALS 1 & 2
AND 2 & C1
5.1
17
2. SET THE OPENING AND CLOSING TIMES
FOR GATES
5.218
3. ADJUSTED THE CONTROL PANEL
5.3
19
4. IF REQUIRED, ACTIVATED AUTOMATIC
CLOSING AND SAFETY PHOTOCELLS
5.4
20
5. PROGRAMMED THE REMOTE TO THE
CONTROL PANEL
5.5
21
6. FITTED MOTOR COVER
5.6
22
END OF INSTALLATION
STAGE 5
Summary of Contents for Ferni Series
Page 34: ......
Page 35: ...NOTES...