3
STAGE 1
CIVIL & MECHANICAL SECTION
1.1 - Pre-Installation Check
BEFORE BEGINNING YOUR FERNI P GATE INSTALLATION CHECK THE
FOLLOWING:
THE GATE POSTS OR PIERS ARE STRONG ENOUGH TO SUPPORT THE
GATES AND THE MOTORS
THE GATES ARE STRONG ENOUGH TO BE AUTOMATED.
THE GATES SWING FREELY FROM OPEN TO CLOSE AND THERE IS NO
FRICTION ON THE HINGS.
Fig 1
IF DISTANCE B IS 0 TO 300mm: DISTANCE A MUST BE AT LEAST 110mm.
IF DISTANCE B IS 300mm TO 380mm: DISTANCE A MUST BE AT LEAST
150mm.
Summary of Contents for Ferni Series
Page 34: ......
Page 35: ...NOTES...