
Pa
g.
44
- M
an
ua
l c
od
e:
11
9
B
S
0
4
E
N
11
9
B
S
0
4
E
N
ve
r.
66
04/
2
01
3 © C
A
M
E c
an
ce
lli auto
m
ati
ci s.p.a. - T
he d
ata a
nd i
nf
or
m
ati
on r
ep
orte
d i
n th
is i
nsta
lla
tio
n m
an
ua
l a
re s
us
ce
pti
bl
e to
c
ha
ng
e at a
ny ti
m
e a
nd w
ith
ou
t o
bl
ig
ati
on o
n C
A
M
E c
an
ce
lli auto
m
ati
ci s.p.a. to n
otify u
se
rs.
ENGLISH
Preliminary checks
Before actually installing the gate operator, your are required to:
• Check that the leaf is rigid and compact and that the rollers are in good working order and properly greased;
• The gate track must be firmly set into the ground, above ground along its entire length and free of any foreign objects (debris) that may
hamper the gate’s movement;
• The top non-pinch rollers must not cause any friction;
• See to installing physical stops at fully-opened and fully-closed positions and the power supply line trench as per the standard instal-
lation;
• Make sure that the spot were the operator is mounted is located in an area that is protects it from any impacts, and that the mounting
surface be solid;
• See to installing a suitable all-pole disconnector switch, with power isolation contacts more than 3mm apart from each other;
•
Connections inside of the casing made to provide continuity to the protection circuit are allowed, as long as they have additional
isolation compared to other internal conductive parts;
• Set up suitable tubing and trenching to allow for electrical cables to pass, making sure they are free from any potential mechanical
damage.
Only expert, qualified personnel must carry out the installation, in full compliance with the applicable law.
Installation
Tools and materials
Make sure you have all the tools and materials handy, to carry out the installation in total safety, according to the laws in-force. Below is
a drawing of the tools you will need to install the operator.
N.B.: An evaluation of the size of the cables with lengths other than the data in the table must be made based on the eff ective absorption
of the connected devices, according to the instructions indicated by the CEI EN 60204-1 standards.
For connections that require several loads on the same line (sequential), the size given on the table must be re-evaluated based on actual
absorption and distances.
Cable list and minimun thickness
Connections
Type of
cable
Length of cable
1 < 10 m
Length of cable
1 < 10 m
Length of cable
20 < 30 m
230V power supply
FROR CEI
20-22
CEI EN
50267-2-1
3G x 1,5 mm
2
3G x 2,5 mm
2
3G x 4 mm
2
230V flashing lamp
2 x 0,5 mm
2
2 x 1 mm
2
2 x 1,5 mm
2
Photoelectric cells TX
2 x 0,5 mm
2
2 x 0.5 mm
2
2 x 0,5 mm
2
Photoelectric cells RX
4 x 0,5 mm
2
4 x 0,5 mm
2
4 x 0,5 mm
2
24V power supply accessory
2 x 0,5 mm
2
2 x 0,5 mm
2
2 x 1 mm
2
Control button
2 x 0,5 mm
2
2 x 0,5 mm
2
2 x 0,5 mm
2
Antenna connection
RG58
max.
1
0 m
www.metalines.com