Cambridge Engineering, Inc.
22
M-Series Technical Manual
Model
W
H
M118
25.5"
25.5"
M120
29.5"
29.5"
M125
35"
35"
M130
41"
41"
M136
47"
47"
Wall Opening
TYPICAL INSTALLATION
VERTICAL MOUNT - OUTDOOR CONFIGURATION
UP BLAST
M118 - M136
EXTERNAL WALL
DISCHARGE DUCT
UNIT ROOF
DUCT OPENING COLLAR
TEK SCREW
OUTER PERIMETER
INSULATION
WALL FLASHING
(BY OTHERS)
DISCHARGE DUCT
LIFTING BRACKETS
POWER
INCOMING
CONTROL WIRING CONDUIT
(BY OTHERS)
7-9 WIRES REQ'D
RCS
(BY OTHERS)
SEDIMENT TRAP
INLET GAS PIPE
HIGH PRESSURE REGULATOR (HPR)
HIGH PRESSURE SHUT-OFF VALVE
(BY OTHERS)
VENT PIPE
(LOCATE MIN. 10 FT
VENT w/ SCREEN
HIGH PRESSURE SUPPLY TAP
(OPTION)
HPR
DISCHARGE DUCT
W/ TURNING VANES
DISCHARGE ELBOW
FROM INTAKE)