8
Pool Assembly / Frame Layout
Step 5
Assembling the long sides first, starting from the side at your right, INSERT INTO THE RECTANGULAR BIG
OPENING CORNER OF THE POOL, THE “A” TOP RAIL WITH THE FEMALE END LOOKING AHEAD.
Make sure to start from the right lateral side. This will allow the corners to fit correctly. Insert the rest of the pipes one
at a time, in order of the diagram on the previous page and make sure they are locked correctly. You will hear a “click”
when they are properly positioned. Make sure all holes in the pipes coincide with the openings on the sleeve of the
liner. Repeat this operation with the opposite long lateral.
Step 6
Assembling the short sides, take a long lateral top rail and extend it outwards, (two people would be best). Repeat with
the opposite long lateral top rail. As you did in Step 5, insert the top rails into the sleeve, STARTING FROM THE
RIGHT AND WITH THE FEMALE END LOOKING AHEAD. Insert one pipe at a time in order to the diagram on
the previous page making sure you hear a “click”. Repeat this operation with the opposite short lateral.
Step 7
To finish with the assembly of the top rail, insert the corner pipe with the male end into the female end of the top rail.
IMPORTANT TIP
:
Make sure to finish top rail assembly by inserting the last corner piece, female end last. This
step is very important as the corner piece is designed with an off set. Failure to follow the instructions may result in
tearing of the material. Do no force corner piece, material will not stretch! Make sure to finish with the female
end last!