CAL
-SERIES
21
9.0
INSTALLATION
Provide for adequate clearance around air openings into the combustion chamber, clearances from
combustible material, provisions for accessibility and for combustion and ventilating air supply.
9.1
PLANNING
•
Familiarize yourself with the equipment and any accessories that you may require.
•
Locate the area where unit is to be installed.
•
Locate area where any holes might have to be cut for:
a)
Venting
b)
Any gas piping requirements
•
Make sure that there is no obstruction such as hidden electrical wiring, water lines etc... in the areas
of concern.
•
Locate the thermostat location.
WARNING:
Observe minimum clearance to combustibles.
•
Locate a grounded, three prong electrical source.
•
Measure the required amount of the various materials required to do the installation, and have these
materials on site in an organized manner prior to commencement.
9.2
TYPICAL GARAGE INSTALLATION