
EVERSKY
™
MS-CDF-019
–
Manufacturing Nr: 22
0001→
Version B
Update: 2022/06/14
51/70
XIX.
PERIODIC MAINTENANCE
XIX.1.
Generalities
Maintenance and decommissioning of the installations must be carried out under conditions that ensure compliance with the
applicable environmental regulatory requirements. Maintenance must be carried out at least once a year or as required by applicable
regulations (fire safety, etc.). Depending on the installation and operating conditions, the inspection interval may be reduced.
The warranty will be void if the maintenance instructions are not followed.
Before starting any maintenance or repair work, it is imperative to switch off the power supply and ensure that it cannot be switched
on again inadvertently (lock the proximity switch in the off position for this purpose).
Service and maintenance work must be carried out by qualified personnel equipped with the appropriate tools and equipment
(Personal Protective Equipment, multimeter, etc.).
Component
Interval
Action