19
Lib
er
at
ors
Troubleshooting
X
Table of Contents
A.
Introduction ------------------------------------------------------------------------- 19
B.
Troubleshooting Charts -------------------------------------------------------- 20–23
C.
Repair Procedures
RP1 General ---------------------------------------------------------------- 24
RP2
Shroud Assembly RR ------------------------------------------------- 24
RP3
Condensation Bottle Bracket RR ------------------------------------- 24
RP4
Liquid Level Meter RR ------------------------------------------------ 24
RP5
Liquid Level Meter Battery RR --------------------------------------- 24
RP6
Liquid Level Meter Calibration -------------------------------------- 25
RP7
G4 Meter Troubleshooting ------------------------------------------- 26
RP8
Manifold Capacitance Test ------------------------------------------- 27
RP9
Manifold Assembly RR ----------------------------------------------- 27
RP10
Resolder Feed-thru Wire --------------------------------------------- 28
RP11
Manifold Harness Assembly RR ------------------------------------- 28
RP12
Clean/Dry Probe & Dewar -------------------------------------------- 28
RP13
Relief Valve Test ------------------------------------------------------ 29
RP14
Relief Valve RR ------------------------------------------------------- 29
RP15
Pressure Retention Test ---------------------------------------------- 30
RP16
Plumbing Leak Test -------------------------------------------------- 30
RP17
Warming and Breathing Coil Assembly RR ------------------------ 31
RP18
Vent Valve RR -------------------------------------------------------- 31
RP19
Twist Lock QDV Lip Seal RR ---------------------------------------- 31
RP20
Twist Lock QDV RR -------------------------------------------------- 32
RP21
Push-on QDV RR ----------------------------------------------------- 32
RP22
Push-on Portable Pop-Off Assembly--------------------------------- 32
RP23
Empty Unit ------------------------------------------------------------ 33
RP24
Warm Unit ------------------------------------------------------------ 33
RP25
Flow Rate Test--------------------------------------------------------- 34
RP26
Operating Pressure Test ---------------------------------------------- 34
RP27
Flow Meter Verification ---------------------------------------------- 34
RP28
Economizer Regulator RR ------------------------------------------- 35
RP29
Economizer Regulator Test ------------------------------------------ 35
RP30
Flow Control Valve (FCV) RR -------------------------------------- 36
RP31
Dewar RR ------------------------------------------------------------- 36
RP32
Normal Evaporation Rate (NER) Test ------------------------------ 36
RP33
Calculating Liquid and Gaseous Oxygen Capacity ----------------- 38
D.
Service Tools / Fixtures / Equipment / Supplies ---------------------------------- 37
Introduction
1. These procedures are designed to be performed only by qualified personnel with proper equipment.
2. Any failure during routine maintenance checks will refer you to this section. See troubleshooting chart for appropriate
procedure.
Liberators Technical Service Manual • PN 13350704 Rev
K