4. Re-check all the dimensions to ensure that each column of the base shape and position consistent with the
chalk line.
5. Firstly, place cylinder in the positioning hole in the column bottom, then after fixing slider to slide, push the slide
to bottom of the column from top. Two columns in place to ensure that the two opposite sides of the column
spacing was equal to the length of cross beam.
6. Base on column bottom hole for position, to drill a hole about 150 mm deep with churn drill on concrete. To
ensure the expansion bolts' fixed-strength, do not get churn drill shaking when drilling hole after drilling with a
vacuum cleaner or wire brush to clean the dust of each hole. Ensure the column in the process to prevent the
dumping or shifting.
7. The nuts should be reserved 3-5mm thread after assembling expansion bolts. Inserted into the drilled hole, and
tapping with a hammer until the bolt to the column bottom of the spring washer parts, then taping pivot bolt until it
cannot move. Measured vertical degree of vertical column with squareness gauge .If column vertical degree is
large, use pad to adjust. After vertical adjustment, tighten the nut bolt.nut tightening torque is about 80N.M.
8. The lift beam is installed between two columns, with the bolts tight.
Warning:
The column vertical degree must be guaranteed, otherwise it will cause lift cannot rise or damage
to person.
9. Connect
equalizer
steels ropes
Raise and lock each beam approximately 1m above the ground;
Make sure that the mechanical safety on each column are fully engaged before attempting to route the equalizer
cables. beams must be equal height from the floor before proceeding;
With the beams in equal height, route the equalizer cables as shown in the figure 10. Make sure the cables in the
place on the pulleys. Make sure the cables routed properly;
After the equalizer cables have been routed, adjust the nut to make each cable in equal tension by using the
adjusting wrench supplied with the lift.
10. Install lift pump unit
Attach the power unit to the POWER SIDE post. Install the vibration dampener between the power unit