Page 13
509 Sharptown Road P.O. Box 345 Bridgeport, NJ 08014
Email: [email protected] Fax: 856-467-5511
Internet: http://caddycorp.com Phone: 856-467-4222
5.
Position Teflon heating tip
R
above and between the dies. Push down on knob
P
and press pin
Q
in to hold
heating assembly down.
6.
Screw capstan
K
forward until both overlapping surfaces contact heating tip
R
. Continue turning capstan as
belt ends melt. Apply just enough pressure to squeeze the melted material out of the welding area.
Continue until capstan stops.
DO NOT OVER TIGHTEN.
7.
After approximately 20 seconds, loosen capstan one turn. Place left hand on side knob
S
. With your right
hand pull pin
Q
, which will let the heating assembly pop up and clear the weld area. Slide the front die
home immediately with slide knob
S
. Quickly spin capstan in and tighten until the stop is reached. It is
IMPORTANT
that this sequence is done quickly.