6
OIL T
ANK
C H I M N E Y
ELEC
TRIC LINE
VENT PIPE
DRAFT
REGULA
TO
R
DIAPHRA
GM
EXP
ANSION T
ANK
AU
TO
M
ATIC
FILL V
AL
VE
AND SHUT
OFF
RELIEF V
AL
VE
TO
RADIA
TION
FROM RADIA
TION
CIRCULA
TING
PUMP IN RE
TURN LINE
OR AFTER
THE
EXP
ANSION
TANK
SHUT OFF
VA
LV
E
OIL FIL
TER
OIL LINES
FOUND
ATIONS
TO
OUT
SIDE
LINES T
O
O
THER
APPLIANCES
SER
VICE LINE
OVERCURRENT
PRO
TEC
TED
SAFE
TY
SWIT
CH
2" FILL
PIPE
MIN. 2" I.D
.
VENT PIPE
ENTRANCE SWIT
CH
OIL BURNER
GENERAL PRINCIP
AL REQUIREMENT
S FOR A
TY
PICAL INST
ALLA
TION
LOCATING THE BOILER
Figure 3 - Boiler With Piping System
Summary of Contents for BW4BAH-105
Page 22: ...22 OPERATING THE BOILER Figure 13 Burner Adjustments and Settings ...
Page 28: ...28 ELECTRICAL WIRING Figure 16 Honeywell L7248L Control With Beckett AFG Burner ...
Page 29: ...29 Figure 17 Honeywell L7248L Control With Riello F5 F10 Burner ELECTRICAL WIRING ...
Page 31: ...NOTES ...
Page 32: ...CAC BDP 7310 West Morris St Indianapolis IN 46231 ...