9
1.
Installation of boiler for new heating system,
Install all of radiation units (panels, radiators,
baseboard, or tubing) and supply and return mains
fi
rst. After all heating system piping and components
have been installed, make
fi
nal connection of system
piping to boiler. It is recommended to mount circulating
pump on supply side piping, such that it pumps away
from expansion tank. Refer to
fi
gures on next pages.
2.
Equip hot water
boiler installed above radiation
level
with low water cut off device. Periodic inspection
is necessary, as is
fl
ushing of
fl
oat type devices, per
low water cut off manufacturer’s speci
fi
c instructions.
3.
Packaged boiler is set up with 1¼” NPT supply
and return piping
from front of boiler. Boiler supply
and return piping can be moved to rear of boiler. Boiler
should not be piped return line to front, supply line
to rear, or vice versa, will cause boiler water to short
circuit heat exchanger. Piping connections may require
additional
fi
ttings and parts.
4.
Install drain valve
provided with boiler in return tee. .
5.
Install Safety Relief Valve
in rear section using ¾”
nipple and street elbow provided with boiler. See
fi
gure
6a.
A. Install safety relief valve with spindle in vertical
position.
B. Do not install shutoff valve between boiler and
safety relief valve.
C. Install discharge piping from safety relief valve.
• Use ¾” or larger pipe. See
fi
gure 6b.
• Use pipe suitable for temperatures of 375°F
(191°C) or greater.
• Individual boiler discharge piping shall be
independent of other discharge piping.
• Size and arrange discharge piping to avoid
reducing safety relief valve relieving capacity
below minimum relief valve capacity stated on
rating plate.
• Run pipe as short and straight as possible to
location protecting user from scalding and properly
drain piping.
• Install union, if used, close to safety relief valve
outlet.
• Install elbow(s), if used, close to safety relief valve
outlet and downstream of union (if used).
• Terminate pipe with plain end (not threaded).
6.
Verify clean cold water supply is available
when
connecting
to pressure reducing valve. When water
supply is from well or pump, a sand strainer should be
installed at the pump.
SYSTEM PIPING
Figure 6a - Safety Relief Valve Installation
Follow Instructions
to install discharge
piping from safety
relief valve to drain.
Check local
codes for
maximum
distance
from fl oor
or allowable
safe point of
discharge
.
SAFETY RELIEF VALVE
DISCHARGE
LINE
Figure 6b - Discharge Piping From Safety Relief
Valve
Summary of Contents for BW4BAH-105
Page 22: ...22 OPERATING THE BOILER Figure 13 Burner Adjustments and Settings ...
Page 28: ...28 ELECTRICAL WIRING Figure 16 Honeywell L7248L Control With Beckett AFG Burner ...
Page 29: ...29 Figure 17 Honeywell L7248L Control With Riello F5 F10 Burner ELECTRICAL WIRING ...
Page 31: ...NOTES ...
Page 32: ...CAC BDP 7310 West Morris St Indianapolis IN 46231 ...