Installing the 9C214-2 Power Supply
2-6
Powering Up a 9C214-2 Power Supply
1. Turn on the 9C214-2 Power Supply using the circuit breaker at the bottom
right of the power supply. (The power supply uses a soft start feature and
does a pre-power diagnostic check. Outputs become enabled within 5 seconds
of power on.)
2. Check to make sure that
a. The PWR Status LED is green.
b. The SMB Status LED is green.
If the LEDs are any color other than green, refer to
LANVIEW LEDs
in Chapter 3.
Before you power up a 9C214-2 Power Supply, make sure that the Environmental
Module and all modules have been properly installed.
NOTE
Summary of Contents for 9C214-2
Page 1: ...SmartSwitch 9000 9C214 2 DC Power Supply Installation Guide 9031305 05 ...
Page 2: ......
Page 6: ...Notice iv ...
Page 8: ...Contents vi ...
Page 14: ...Introduction 1 6 ...
Page 26: ...9C214 2 Power Supply Operation 3 6 ...
Page 30: ...Specifications 4 4 ...