background image

6.  Remove and discard all joint hardware and the detached line with nozzle 

and carabiner.  DO NOT REUSE OLD HARDWARE.  ONLY USE THE NEW 
HARDWARE  PROVIDED  WITH  THE  REPLACEMENT  KIT  FOR  NEW  LINE 
REPLACEMENT!

7.  Insert the new threaded dowel pin into 

the  loop  formed  by  the  blue  webbing 
(Figure 8).  Align the threaded hole with 
the hole in the blue webbing loop.

8.  Using  the  Allen  wrench,  secure 

the  new  replacement  line  to 
the  blue  webbing  by  running 
the  bolt  through  the  hole  in 
the  blue  webbing,  and  into  the 
threaded  dowel  pin 

(Figure 9)

 

9.  While  tightening  the  bolt,  ensure 

that the two dowel pins and the blue 
and  black  webbing  loops  remain 
parallel 

(Figure 10).  Realign the pins 

if necessary.  Make certain the bolt 
is tight.  Avoid excessive loosening 
and re-tightening of the bolt, as this 

Figure 8

Figure 9

Figure 10

will  wear  off  the  nylon  patch  on  the  bolt.    DO  NOT  RE-USE  THE  OLD 
BOLT, as the patch will have worn off, and may loosen during operation!

6.

7.

8.

9.

Summary of Contents for Perfect Descent

Page 1: ...g System are responsible for the safety and supervision of climbers using this equipment C3 Manufacturing requires all operators to be trained before using this product These instructions must be prov...

Page 2: ...laced twice annually or after 5 000 climb lower cycles whichever comes first The enclosed kit may also be used to replace the carabiner if upon inspection it does not function properly is damaged or w...

Page 3: ...action or have someone hold the Perfect Descent handle while the line is being extracted 2 Remove the Phillips head screw located near the line nozzle Figure 2 3 Note the vertical orientation of the w...

Page 4: ...placement Release the webbing making certain that the line is adequately secured and that the screwdriver will not slip loose or rotate Place some duct tape across the screwdriver and housing nose to...

Page 5: ...nch secure the new replacement line to the blue webbing by running the bolt through the hole in the blue webbing and into the threaded dowel pin Figure 9 9 While tightening the bolt ensure that the tw...

Page 6: ...ct prior to use by extracting all of the line and returning it once again to the housing Check for smooth operation and proper line retraction 11 With the nozzle slot oriented vertically and no twists...

Page 7: ...e line dragging on the housing impeding retraction If you suspect that the line has become twisted during the replacement process remove the Perfect Descent from use until the unit can be returned to...

Page 8: ...further information 3809 Norwood Drive Unit 4 Littleton CO 80125 Phone 303 953 0874 Fax 303 862 8442 Info PerfectDescent com www PerfectDescent com Perfect Descent Climbing Systems is a division of C3...

Reviews: