PERFORMANCE
DATA
CHART
(NOMINAL)
Performance
Data
(Nominal)
C-DAX
Unit
Model
Flow
Rate
to
Boom
(lit/min)
Nozzle
Designation
Flow
Rate
per
Nozzle
(lit/min)
Application
Rate
at
Each
Forward
Speed
(lit/ha
at
km/hour)
Range
of
Tank
(hectares
at
km/hour)
SR50
SR80
T
(
8
10
12
8
10
12
8
10
12
5
WB200
3.60
3.80
4.00
4.20
110UF03
0.90
0.95
1.00
1.05
135
142
150
157
108
114
120
126
88
93
98
103
0.37
0.35
0.33
0.32
0.46
0.44
0.41
0.39
0.57
0.54
0.51
0.48
0.59
0.56
0.53
0.51
0.74
0.68
0.66
0.63
0.90
0.86
0.81
0.77
1
1
1
1
WB300
V300
3.60
3.90
4.20
4.50
110UF02
0.60
0.65
0.70
0.75
90
97
105
112
72
78
84
90
59
64
69
74
0.55
0.51
0.47
0.45
0.69
0.64
0.59
0.55
0.85
0.78
0.72
0.67
0.88
0.82
0.76
0.71
1.10
1.02
0.95
0.88
1.35
1.25
1.15
1.08
1
1
1
1
V400,
4A
(8002
pump)
4.20
110UF02
0.53
80
64
50
0.62
0.78
1.0
1.0
1.25
1.6
1
V400,
4A
(8003)
pump)
4.70
110UF02
0.59
90
71
59
0.55
0.70
0.85
0.88
1.08
1.35
1
NOTE:
“TOTAL
FLOW
RATE
TO
BOOM”
is
pre-determined
by
nozzles
supplied
and
each
pumps
performance.
Calibrate
(check
flow
form)
nozzles
to
determine
your
application
rate
at
each
of
the
above
forward
speeds.
Calibrate
nozzles
frequently
to
check
application
rate.
Chemical
for
tank
-
multiply
range
of
tank
(
hectares)
by
chemical
rate
per
hectare.
eg,
if
flow
from
nozzles
(with
ATV
at
operating
rpm)
on
WB200
boom
is
0.85
litres/minute
each,
travel
speed
is
12
km/hour,
and
chemical
rate
is
2
litre/hectare
then
put
2
x
0.53
=
1.06
litres
of
active
ingredient
in
the
tank.
SUGGESTED
operating
height
for
nozzles;
0.5
metres
above
the
target.
Y:\Manuals\Current\90024-3-PNozz.DOC
13