background image

6

Installation on FREEDOM unit

A

B

Cut off the mains power supply before carrying 
out any operation.

Open the electromechanical operator with the 
control station following the instructions sup-
plied with the FREEDOM unit.

Install the batteries as shown in the fi gure (no 
screws or brackets required) and pass the bat-
tery connection cables through slot A: 

Disconnect the battery charger connector 
(shown in the fi gure) from the control station’s 
cover:

Fasten the battery charger as shown in the 
fi gure, applying double-sided adhesive tape in 
zone B:

Connect the batteries and the battery charger 
as described in the “Connections” section.

Close the electromechanical operator with the 
control station following the instructions sup-
plied with the FREEDOM unit.

Summary of Contents for CB/BY

Page 1: ...1 L8542497 ENG 10 2009 rev 0 Emergency battery kit CB BY MADE IN ITALY...

Page 2: ...he same time The kit is composed of the following parts 1 Battery charger board The battery charger board must be connected between the bat teries and the control station using the ca bles supplied Th...

Page 3: ...owered the gearmotor return it to its operating position Open the gearmotor assembly following the in structions supplied with the JUMP unit Disconnect the battery charger connector shown in the gure...

Page 4: ...ket and screws as shown in the gure On the battery charger re move the screw on the side opposite the terminal board Disconnect the battery charger connector shown in the gure from the control station...

Page 5: ...the mains power supply before carrying out any operation Open the control station following the instruc tions supplied with the BEAUTY unit Install the batteries using the relative bracket and screws...

Page 6: ...s or brackets required and pass the bat tery connection cables through slot A Disconnect the battery charger connector shown in the gure from the control station s cover Fasten the battery charger as...

Page 7: ...s A B Cut off the mains power supply before carrying out any operation Connect cable A from the batteries to cable B on the battery charger Connect the battery charger to the control unit using cable...

Page 8: ...8 BYOU srl _ via dell Industria 91 _ 36030 Sarcedo Vicenza ITALIA _ tel 39 0445 363133 _ fax 39 0445 378 931 _ e mail info byouweb com _ web www byouweb com...

Reviews: