
32
4.8 Wiring
Wiring order
PV inverter
②
general load
distribution board
②
Essential load
distribution board
Router
PV panel
Grid
Essential
load
CT2
RJ45
Ethernet
QF
(25A)
③ MINIES wiring
Grid
①
PV current transducer
Communication
cable
Power cable
④Ethernet cable
Direction of
wiring
The same area
①Grid current transducer
CT1
Applied by installer
System installation
QF(16A)
MINIES
DRED
RJ45
RS485
figure18. Wiring diagram
Step No.
Description
①
Cable connection of general distribution board
Cable connection of essential load distribution board
②
Installation of the current transducer for grid
Installation of the current transducer for PV inverter
③
Cable connection of MINI ES
④
Network cable connection from MINI ES to router
No.
Details
①
Household grid current transducer
PV current transducer
②
General & essential load distribution board
③
MINIES Wiring
④
Connect the data cable with the router