![Byan 600A Series Installation And Operator'S Manual Download Page 11](http://html.mh-extra.com/html/byan/600a-series/600a-series_installation-and-operators-manual_2836899011.webp)
-11-
MODEL 600 SERIES OPERATOR | Rev. 2019.7.1
INSTALLATION COMPLETION
WARNING
TO REDUCE THE RISK OF SEVERE INJURY OR DEATH,
READ AND FOLLOW ALL INSTALLATION INSTRUCTIONS
1. Install placards and safety equipment and test.
2. Remove all debris and obstructions from the travel path of the gate leaf(s).
3.
Turn on and label the commercial power circuit breaker and remove the “used” tag you installed at the
beginning of the project.
4. Using the manual bypass, position the gate leaf at 45 degrees. Press the test button on the G2M+ Control
Board. The first signal will always be to OPEN. If the operator runs to the CLOSED position, turn off the
commercial power and reverse the motor connections on Pins 1 and 3.
5. Operate the actuator several times until you can detect a rise in the hydraulic fluid temperature. This can be
determined by placing your hand on the top of the operator at the rear.
6. Purge and adjust the operator as describ
ed in “Purging and Adjustments” section.
7. Instruct the end user how to manually release the gate in the event of a power failure.
8. Instruct the end user how to properly operate the gate automation and safety features thereof.
9.
Collect the signed “End
User Safety Handout”. By signing, the end user acknowledges their understanding of
their responsibilities in owning, operating and maintaining a vehicular automatic gate operating system.