UK
28
13.4
Start-up Test
Name of customer:
Plant number:
Work-sheet number:
Temperature [°C]:
Conductivity [µS/cm]:
Hardness [°dH]:
Inlet pressure [bar]:
Softening unit
If "no" skip this section
Type of plant:
Hardness [°dH] after softening:
Tick if "yes"
RO-plant
Type of plant:
Raw -w ater pressure [bar]: Outlet press., high-press. pump [bar]: Recirculation flow [l/h]:
Permeate flow [l/h]:
Concentrate flow [l/h]:
Outlet press., permeate [l/h]:
Conductivity, permeate [µS/cm]:
Permeate tank
Status on start-up
Problems on start-up
In case of problems, please fill in the problem report
Problem report
Can the problem be related to the manufacturing?
Can the problem be related to the plant or the installation?
The plant - we mean only the part of the whole installation which was delivered by BWT (i.e only the plant).
The installation - we mean the piping etc. leading to the plant.
Can the problem be related to the sales department?
Description, please describe the problem
Signature
Name/initials of technician:
Date:
Time consumption for the start-up [hours]:
Start-up test
The start-up test sheet must be completed and filed together with the operating journal.
Test of raw water
YES
Time-controlled
Quantity-controlled
New
Old
Dimensioned correctly for RO
Plant and salt valve set at the correct hardness
Direction, high-press. pump is OK
Level switch, start/stop of high-press. pump is OK
Inlet press. switch is OK
Pressure switch start/stop, transport pump is OK
Drainage protection, transport pump is OK
Pre-pressured hydrophore is OK
YES, there were problems at start-up
Start-up by dealer, specify dealer _____________________________________
YES, the problem can be related to the manufacturing
NO, the problem cannot be related to the manufacturing
NO
Level switch have the right lengh for the plant
NO, there were no problems at start-up
Start-up by BWT
YES, the problem only concerns the plant
YES, the problem only concerns the installation
YES, the problem concerns both the plant and the installation
NO, the problem does not concerns the plant or the installation
YES, the customer was misinformed
NO, the customer had been well-informed
Summary of Contents for PERMAQ COMPACT 51
Page 2: ...UK 2...
Page 10: ...UK 10 9 2 3 Alarm Low raw water pressure 9 2 4 Alarm Transport pump...
Page 11: ...UK 11 9 2 5 Indication Level low 9 2 6 Alarm Level high...
Page 12: ...UK 12 9 2 7 The plant is not operating...
Page 20: ...UK 20 13 1 P I Diagram...
Page 21: ...UK 21 13 2 Layout Drawings...
Page 22: ...UK 22...
Page 23: ...UK 23...
Page 24: ...UK 24...
Page 25: ...UK 25 13 3 Wiring Diagrams...
Page 26: ...UK 26...
Page 27: ...UK 27...
Page 32: ...UK 32 13 7 Spare Parts Drawing...