OPERATION
MPG PLUGGER 09/20
Operation Section 4-15
O
PE
R
AT
IO
N
© 2020 Alamo Group Inc.
9. Shutting Down the Implement
To shut down the implement, first bring the tractor to
a complete stop.
Park the tractor on a level surface, place the
transmission in park or neutral and apply the
parking brake, lower the attached implement to the
ground, shut down the engine, remove the key,
before exiting the tractor.
Pin parking stand into position and lower the implement to the ground with rockshaft control in position control.
Remove top link from mast, disconnect hitch arms from bottom pins and pull tractor away from implement.
11. STORAGE
Properly preparing and storing the plugger at the end of the season is critical to maintaining its appearance
and to help ensure years of dependable service. The following are suggested storage procedures:
•
Thoroughly clean all debris off the unit to prevent damage from rotting grass and standing water.
•
Lubricate all grease points as detailed in the maintenance section.
•
Tighten all bolts and pins to the recommended torque.
•
Check the unit for worn and damaged parts. Perform repairs and make replacements immediately so that
the unit will be ready for use at the start of the next season.
•
Store the unit in a clean, dry place resting securely on the level ground.
•
Use spray touch-up enamel where necessary to prevent rust and maintain the appearance of the unit.
10. DISCONNECTING THE AERATOR FROM THE TRACTOR
Before disconnecting the aerator, all movement must cease. Move the implement to a level storage location
and lower the unit to the ground. If the aerator is not resting securely on the ground, block the implement up
securely before attempting to disconnect it from the tractor.
Use extreme care to keep feet and hands from under the aerator and clear of any pinch points.
OPS- A-0005_A
Always shut the Tractor completely down, place the transmission in park, and set the
parking brake before you or anyone else attempts to connect or disconnect the Implement
and Tractor hitches.
(S3PT-15)
Summary of Contents for TOUGH MPG-600
Page 4: ...LUBRICATION INFORMATION 5 2 SPOONS 5 3 STORAGE 5 3 PROPER TORQUE FOR FASTENERS 5 3 ...
Page 5: ...Safety Section 1 1 SAFETY SECTION ...
Page 17: ...SAFETY MPG PLUGGER 09 20 Safety Section 1 13 SAFETY 2020 Alamo Group Inc Decal Description ...
Page 19: ...Introduction Section 2 1 INTRODUCTION SECTION ...
Page 24: ......
Page 25: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 27: ...Operation Section 4 1 OPERATION SECTION ...
Page 47: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 50: ...MAINTENANCE MPG PLUGGER 09 20 Maintenance Section 5 4 MAINTENANCE 2020 Alamo Group Inc ...
Page 52: ...MPG 600 MPG 720 PLUGGER 09 20 P N50037571 Printed U S A MPG 600 AND MPG 720 PLUGGER ...