Maintenance | 7
0870569784_RA_RC1000-1600B_-0003_IM_en
15 / 28
If condensable vapours are to be conveyed:
START
Open the gas ballast
valve* (GB)
Warm up the
machine
30 minutes
30 minutes
• Open the inlet
valve
• Perform the
process
• Close the inlet
valve
Close the gas ballast
valve*
END
* may be considered as optional on certain products
7
Maintenance
WARNING
Machines contaminated with hazardous material.
Risk of poisoning!
Risk of infection!
If the machine is contaminated with hazardous material:
• Wear appropriate personal protective equipment.
CAUTION
Hot surface.
Risk of burns!
• Prior to any action requiring touching the machine, let the machine cool down first.
• Shut down the machine and lock against inadvertent start up.
• Vent the connected lines to atmospheric pressure.
Version with water-oil heat exchanger:
• Turn off the water supply.
• Disconnect all connections.
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The
intervals given below are desired to be considered as starting values which should be
shortened or extended as appropriate. Particularly heavy duty operation, such as high
dust loads in the environment or in the process gas, other contamination or ingress of
process material, can make it necessary to shorten the maintenance intervals significant-
ly.
Interval
Maintenance work
Weekly
• Check the oil level.
• Check the machine for oil leaks - in case of leaks have
the machine repaired (contact Busch).