
7 | Maintenance
18 / 28
0870203785_WZ3600A_-0001_IM_en
NOTICE
Using inappropriate cleaners.
Risk of removing safety stickers and protective paint!
• Do not use incompatible solvents to clean the machine.
CAUTION
Failing to properly maintain the machine.
Risk of injuries!
Risk of premature failure and loss of efficiency!
• Respect the maintenance intervals or ask your Busch representative for service.
• Shut down the machine and lock against inadvertent start up.
• Turn off the water supply.
• Vent the connected lines to atmospheric pressure.
If necessary:
• Disconnect all connections.
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The
intervals given below are considered as starting values which should be shortened or ex-
tended as appropriate. Particularly harsh applications or heavy duty operation, such as
high dust loads in the environment or in the process gas, other contamination or ingress
of process material, can make it necessary to shorten the maintenance intervals signifi-
cantly.
Interval
Maintenance work
Monthly
.
• Check the machine for oil leaks - in case of leaks have
the machine repaired (contact Busch).
Yearly
• Perform an oil inspection; change it if the oil has
changed its initial colour, see
Every 16000 hours, at the
latest after 4 years
• Change the oil of the gear and bearing housings
(both sides)
• Clean the magnetic plugs (MP)
• Have a major overhaul on the machine (contact
Busch).