background image

COBRA NS (DP) vacuum pump

Prepare the quantity of oil specified in the table “Oil quantity”

NOTE

: The quantity of oil specified in the installation handbook is of

informative nature only. Check the oil level with the help of the various

oil sight glasses (OSG 1, OSG 2) on the vacuum pump.

CAUTION

Before you change the type of oil, make sure that the new type is

compatible with the old type. If necessary, flush the vacuum pump.

Unscrew the oil filler cap (OFP)

Fill in oil

Make sure that the oil level is in the target circle of the oil sight

glasses

Oil level, pump not operating

Make sure that the seals of the oil filler cap are not damaged.

Replace them if necessary

Screw on the oil filler cap hermetically tight

NOTE

: It is easier to switch on the vacuum pump with cold oil when 

the intake line is not closed or when the intake flange is not covered by 

a rubber plate.

Start the vacuum pump

If the intake line is equipped with a shut-off device:

Close the shut-off device

If the intake line is not equipped with a shut-off device:

Place a rubber plate on the intake flange

Let the vauum pump run for a few minutes

Stop the vacuum pump and wait a few minutes

Make sure that the oil level still lies in the target circle of the oil

sight glasses

If the oil level is below the target circle:

Fill in more oil

If the intake line is equipped with a shut-off device:

Open the shut-off device

If the intake line is not equipped with a shut-off device:
Remove the rubber plate from the intake flange and connect the intake

line to the intake flange

CAUTION

In case of a vacuum pump  filled with oil, make sure that by lifting

the inclination angle of the vacuum pump do not exceed 5° from

the horizontal. In case of too high inclination (>5°), risk of oil leak

within the work area

Make sure before every transport using the appropriate lifting

mean that the inclination of the vacuum pump is less than 5°.

CAUTION

The vacuum pump must remain in a horizontal position when it has

been filled with oil.

WY (MB) rotary lobes vacuum pump

Prepare the quantity of oil specified in the table “Oil quantity”

NOTE

: The quantity of oil specified in the installation handbook is of

informative nature only. Check the oil level with the help of the various

oil sight glasses (OSG 3,OSG 4) on the vacuum pump.

CAUTION

Before you change the type of oil, make sure that the new type is

compatible with the old type. If necessary, flush the vacuum pump.

Unscrew the oil filler cap (OFP)

Fill in oil

Make sure that the oil level lies in the target circle of the oil sight

glasses

Oil level, pump not operating

Make sure that the seals of the oil filler cap are not damaged.

Replace them if necessary

Screw on the oil filler cap hermetically tight

NOTE

: It is easier to switch on the vacuum pump with cold oil when 

the intake line is not closed or when the intake flange is not covered by 

a rubber plate.

COBRA DS vacuum pump

Start the vacuum pump

If the intake line is equipped with a shut-off device:

Close the shut-off device

If the intake line is not equipped with a shut-off device:

Place a rubber plate on the intake flange

Let the vacuum pump run for a few minutes

Stop the vacuum pump and wait a few minutes

COBRA NS (DP) vacuum pump

Make sure that the oil level still lies in the target circle of the oil

sight glasses

If the oil level is below the target circle :

Fill in more oil

If the intake line is equipped with a shut-off device:

Open the shut-off device

If the intake line is not equipped with a shut-off device:

Remove the rubber plate from the intake flange and connect

the intake line to the intake flange

DS 8161 F

Installation and start-up

Page 13

0870235853

 (En)

MAX

MIN

MAX

MIN

MAX

MIN

MAX

MIN

MAX

MIN

MAX

MIN

Summary of Contents for COMBI COBRA DP 600 C

Page 1: ...liers Busch S A Zone industrielle 2906 Chevenez Switzerland 0870235853 _en Original instructions Modi cations reserved 07 12 2020 Instruction manual COMBI Screw Vacuum Pumps and Boosters COBRA DS 8161...

Page 2: ...ogram 19 Weekly 19 Monthly 19 Yearly 19 Every 16 000 hours of operation at the latest after 4 years 20 Lock Out Tag Out procedure 20 Safety Lockout procedure 20 Checking the oil 20 Checking the oil le...

Page 3: ...re reducer CWC Cooling water connection DGC Nitrogen connection OSG Oil sight glass CAO Extracting ventilator MB On off switch Main circuit breaker ESS Emergency stop switch EMO RF Ventilator PLC PLC...

Page 4: ...switch cooling water HE Heat exchanger CWV Regulating valve coolingwater FS Flow switch booster OSG3 Oil sight glass OSG1 Oil sight glass PRV Nitrogen regulatingvalve CLP Glycol circulatingpump TS2 Te...

Page 5: ...cator MB OSG4 Oil level indicator MB PGI Process gas inlet PGO Process gas outlet PRV Nitrogen regulating valve TR Temperature regulator 55 C TS1 Temperature switch oil temperature 120 C TS2 Temperatu...

Page 6: ...e 100 C The pump will stop immediately after the emergency alarm ring a direct cooling water circuit in the motors in the cylinder covers A and B side of WY rotary lobes vacuum pump and COBRA NS vacuu...

Page 7: ...safety regulations and must train and instruct his personnel accordingly Local regulations regarding the motors and electric control elements must be observed when installing the pump in potentially...

Page 8: ...irst then outlet and nitrogen quick connections Put the label or warning board Maintenance processing on or next to the pump SafetyLockout procedure Take off the label or warning board Maintenance pro...

Page 9: ...to unfavourable ambient condi tions for example aggressive environment frequent temperature changes begin immediately with preservation work on the vacuum pump In the caseof favourable ambient condit...

Page 10: ...ills the requirements for assembly dismantling Make sure that no temperature sensitive parts for example of plastic wood cardboard paper electronic parts come into contact with the hot surfaces of the...

Page 11: ...that the regulations of the Electromagnetic Compatibility Directive 2014 30 EU as well as standard EN norms safety directives and especially local and national regulations are observed this is the res...

Page 12: ...e discharge lines Make sure that all caps safeguards and similar covers are mounted Make sure that the inlet and outlet for the cooling air are not cover ed or closed and that the flow of cooling air...

Page 13: ...leak within the work area Make sure before every transport using the appropriate lifting mean that the inclination of the vacuum pump is less than 5 CAUTION The vacuum pump must remain in a horizontal...

Page 14: ...just under cylinder upper plate In casecooling liquid level is belowrequired level Fill in more cooling liquid If the intake line isequipped with a shut off device Open the shut off device If the inta...

Page 15: ...rectly The cooling water flow is factory set on 10 Nl min and can be adjusted at the regulating cock CWV This water circuit is used to cool the motor of the DP and MB vacuum pumps Make sure that the n...

Page 16: ...aks repair the vacuum pump Busch Inspect the vacuum pump for leaks of cooling liquid if there are leaks repair the vacuum pump Busch Inspect the vacuum pump for leaks of cooling water if there are lea...

Page 17: ...densate drain Drain the oil see Draining the oil WY MB rotary lobesvacuumpump If the oil level does not reach the target circle Top up with oil see Refilling oil If the oil level exceeds the target ci...

Page 18: ...d drain any remaining oil Check that no metal swarf sticks to the magnet of the drain plug clean if necessary Refit the oil drain plugs and tighten up Dispose of the used oil in compliance with applic...

Page 19: ...f cylinder upper plate Screw on the cooling liquid filler cap again If liquid has run on to the outside surfaces of the vacuum pump wipe it off Draining the cooling liquid Make sure that the vacuum pu...

Page 20: ...einto pores openings andother internal partsof the vacuumpump There is ahealth hazardwhen dismantling the vacuumpump There is also a danger to the environment Prior to shipping the vacuumpumpmustimper...

Page 21: ...smantled drain the oil dispose of the oil according to local environmental protection regulations drain the cooling liquid dispose of the cooling liquid according to local environmental protection reg...

Page 22: ...d to hazardous pumpconditions whichcouldcausepersonalinjury Oil quantity The quantity of oil specified in the following table isof informative nature only Check the oil level with the help of the vari...

Page 23: ...e glycol and water for the cooling liquid corresponds to a percentage of 40 pure glycol and 60 water It istherefore not necessary to prepare the mix before use But when using pure glycol it isimperati...

Page 24: ...12 5 10 0 Motor rating DP MB 60 Hz 90 Hz kW 15 15 Nominal motor speed DP 60 Hz min 1 3600 Nominal motor speed MB 90 Hz min 1 5400 Noise level EN ISO 2151 50 Hz 60 Hz dB A dB A 75 Ambient temperature C...

Page 25: ...lectrical and electronic equipment and following the standards Person authorised to compile the technical file Gerd Rohweder BuschDienste GmbH Schauinslandstr 1 DE 79689 Maulburg Icheon si 07 12 2020...

Page 26: ...Note...

Page 27: ...Note...

Page 28: ...ch Belgium info busch be Hungary busch buschvacuum hu Norway post busch no Taiwan service busch com tw Brazil vendas buschdobrasil com br India sales buschindia com Peru info busch com pe Thailand in...

Reviews: