Installation
Mounting
l
Make sure that the “Necessary installation instructions” are follo-
wed
l
Fasten or install the pump at its final installation site
Electrical connection
WARNING
Risk of electrocution, risk of damage.
Electrical installation must be performed by a suitably qualified
electrician who knows and follows the following regulations:
- IEC 364 or CENELEC HD 384 or DIN VDE 0100,
- IEC Report 664 or DIN VDE 0110,
- VBG 4 or corresponding national regulations on accident
prevention
CAUTION
The circuit diagrams described below conform to the standard.
Other circuit diagrams might be used. This depends on the particu-
lar order and the market.
Risk of damage to the motor!
Check the connection of the motor inside the terminal box accor-
ding to the circuit diagram.
Motor of screw pump DS 0600 E is connected at factory.
CAUTION
When connecting up the wires into the terminal box: please make
sure the tightening torque of
3 Nm
is adhered to and check with a
calibrated torque wrench (Nuts M6).
Three phase motor connection
Star-star connection (Low voltage)
Star connection (High voltage)
Thermo switch connection
Connection of supply cable to control box
l
Pass the cable through cable fitting of control box
l
Open the electrical board
l
Unscrew the two screws of the bottom main contactor cover and
remove the cover
l
Unscrew completely the first connector on the main contactor
l
Place the first phase wire and screw it completely, tight at 15 Nm
l
Repeat the procedure for the two other phases
l
Unscrew completely the ground phase screw
l
Connect the ground wire to ground terminal
l
Rescrew the ground phase and tight it at 15 Nm
l
Remount the cover of the main contactor
Installation and start-up
DS 0600 E
Page 10
0870772383 (En)
T7
T8
T9
T1
T2
T3
L1
L3
L2
T4
T5
T6
T4
T5
T6
T7
T8
T9
W1
L1
L3
L2
T1
T2
T3
P1
P2
T9
T8
T6
T7
T5
T3
T1
T2
T4
P1
P2
P3
P4
Summary of Contents for COBRA DS 0600 E
Page 22: ......