SECTION III:  INSTALLATION INSTRUCTIONS

A. REMOVE CRATE — (Packaged Boilers)

1. Remove all fasteners at crate skid.
2. Lift outside container and remove all other inside

protective spacers and bracing. Remove draft
regulator box and miscellaneous trim bag
containing safety/relief valve, and pipe fittings.

B. REMOVAL OF BOILER FROM SKID

Fig. 7

1. Boiler is secured to base with 4 bolts, 2 on left side

and 2 on right side, see Figure 7. Remove all bolts.

2. Tilt boiler to right and to rear. Using right rear leg

as pivot, rotate boiler 90° in a clockwise direction,
and lower left side of boiler to floor. Tilt boiler and
remove crate skid. Care should be exercised to
prevent damage to jacket or burner.

C. MOVE BOILER TO PERMANENT POSITION by

sliding or walking.

D. INSPECT COMBUSTION TARGET WALL AND

COMBUSTION CHAMBER LINER

1. OPEN FLAME OBSERVATION DOOR AND/OR

BURNER SWING DOOR on front of boiler. Use
flashlight to inspect target wall secured to rear
section with silastic sealant. Inspect ceramic fiber
blanket secured to floor of boiler with water glass
adhesive. If either is damaged they must be
replaced.

E. CONNECT SUPPLY AND RETURN PIPING TO

HEATING SYSTEM.

CLEARANCES — Steam and hot water pipes shall
have clearances of at least ½” from all combustible
construction.

1. With STEAM HEATING, see Figure 8. Consult I =

B = R Installation and Piping Guide No. 200.

2. With Forced Circulation HOT WATER HEATING,

see Figure 9. Consult I = B = R Installation and
Piping Guide No. 200.

3. Packaged boilers.  Install Safety Valve in Tapping

M.  Use ¾ NPT x 8" nipple and ¾ NPT coupling
included in trim bag.  Safety Valve must be
installed with spindle in vertical position.

TS-39-26-A

4. Packaged boilers with Probe style LWCO.  Install

Limit in Tapping A using ¾ NPT x 2" nipple, ¾
NPT elbow, ¾ NPT x ¼ NPT bushing, and syphon
included in trim bag.  See Figure on previous page.
Connect wiring harness from Low Water Cutoff.
See Figure below.

TS-39-126-A

5. If this boiler is used in connection with

refrigeration systems, the boiler must be installed so
that the chilled medium is piped in parallel with the
heating boiler using appropriate valves to prevent
the chilled medium from entering the boiler, see
Figure 10. Also consult I = B = R Installation and
Piping Guides.

6. If this boiler is connected to heating coils located in

air handling units where they may be exposed to
refrigerated air, the boiler piping must be equipped
with flow control valves to prevent gravity
circulation of boiler water during the operation of
the cooling system.

7. Use a boiler bypass if the boiler is to be operated in

a system which has a large volume or excessive
radiation where low boiler water temperatures may
be encountered (i.e. converted gravity circulation
system, etc.).

Remove the circulator and install a pipe tee
between the circulator and boiler return along with
a second tee in the supply piping as shown in
Figure 11. The bypass should be the same size as
the supply and return lines with valves located in
the bypass and supply outlet as illustrated in Figure
11 in order to regulate water flow for maintenance
of higher boiler water temperature.
Set the by-pass and boiler supply valves to a half
throttle position to start. Operate boiler until the
system water temperature reaches its normal
operating range.
Adjust the valves to maintain 180°F boiler water
temperature.  Adjust both valves simultaneously.
Closing the boiler supply valve and opening the by-
pass valve will raise the boiler water temperature
and lower the supply temperature.  Opening the
boiler supply valve while closing the by-pass valve
will lower the boiler water temperature and raise
the supply temperature.

8. A hot water boiler installed above radiation level

must be provided with a low water cutoff device as
part of the installation.

Summary of Contents for V7 SERIES

Page 1: ...he installationofULClabeled V 7 Series Boilers As an ENERGY STAR Partner Burnham Corporation has determined that the V73WR 0 60 GPH V74WR 0 80 GPH V75WR 0 90 GPH and V76WR 1 15 GPH meet the ENERGY STA...

Page 2: ...ASON FOR ANY OBSTRUCTIONS A CLEAN AND UNOBSTRUCTED CHIMNEY FLUE IS NECESSARY TO ALLOW NOXIOUS FUMES THAT COULD CAUSE INJURY OR LOSS OF LIFE TO VENT SAFELY AND WILL CONTRIBUTE TOWARD MAINTAINING THE BO...

Page 3: ...Size Water Content Gallons Heat Transfer Surface Area Sq Ft Approximate Shipping Weight LB A B C Steam Boiler Water Boiler Steam Boiler V72 11 3 8 6 3 8 5 8 x 8 x 15 10 6 381 V713 16 8 3 4 6 8 x 8 x...

Page 4: ...4 Figure 1B V73 thru V79 Water Boiler with Tankless Heater WBT Figure 1C V73 thru V79 Steam Boiler with or without Tankless Heater SBT or SB...

Page 5: ...5 Figure 1E V713 and V714 Packaged Water Boiler with Tankless Heater WBT Figure 1D V713 and V714 Packaged Water Boiler Less Tankless Heater WB Burnham...

Page 6: ...de at least 24 clearance from front jacket panel for servicing and removal of front tankless heater increase to 30 for A54 heater Provide at least 24 clearance from right side of boiler or top of boil...

Page 7: ...If loose retighten mounting hardware If flue plate or sealing insulation is damaged repair or replace as needed G INSTALL AND SECURE CANOPY with cerafelt gasket and hardware provided to ensure gas ti...

Page 8: ...ss Probe LW CO Water G aug e G lass Pre ssuretrol a nd LW CO Flo at Flush Plu g F L4 006 A Op era tin g C on trol Disre gard L81 24 C Op era tin g C on trol G 1 Bushe d to for Draincock O ptiona l Re...

Page 9: ...Fold panel at perforation keeping insulation inward Align left side panel mounting holes with the front and rear panel holes Secure with 8 x long sheet metal screws 5 Install jacket top panel Place ja...

Page 10: ...e slot with vertical set of bolts engage hex head of bolts and rotate burner to the left Install two remaining 5 16 x long bolts in horizontal sets of holes Level burner and fully tighten all bolts K...

Page 11: ...eturn on water boilers 5 If CIRCULATOR not supplied with boiler is to be mounted directly to 1 boiler return tapping G use the piping arrangements outlined in steps a thru e as follows a Thread 1 x 3...

Page 12: ...ded in trim bag See Figure on previous page Connect wiring harness from Low Water Cutoff See Figure below TS 39 126 A 5 If this boiler is used in connection with refrigeration systems the boiler must...

Page 13: ...13 Fig 8 V73 Thru V79 Recommended Boiler Piping For Gravity Return Steam Boiler Fig 9 V72 thru V79 V713 and V714 Recommended Boiler Piping for Series Loop Forced Hot Water System TS 39 17 D TS 39 4 C...

Page 14: ...he distribution system 5 Isolating the boiler from the system water by installing a heat exchanger F CONNECT TANKLESS HEATER PIPING AS SHOWN IN Figure 12 See Tables 3 and 3A for Tankless Heater Rating...

Page 15: ...raft at all times to assure safe proper operation of the boiler See Figure 13 for recommended installation 1 Install a draft regulator supplied with boiler following the instructions furnished with th...

Page 16: ...nto a container Continue to bleed for 15 seconds after oil is free of air bubbles Stop burner and close valve requires less fuel to be burned and sends less heat up the chimney A new boiler probably h...

Page 17: ...S Figure 15 TABLE 4 SINGLE STAGE UNITS 3450 RPM TWO PIPE SYSTEMS Lift H See Fig 16 Manimum Length of Tubing H R See Figure 16 3 8 OD Tubing 3 GPH 1 2 OD Tubing 3 GPH 0 84 100 1 78 100 2 73 100 3 68 10...

Page 18: ...be low water cutoffs will shut down the burner after a 10 15 second delay if the water level in the boiler drops too low The Hydrolevel CG 450 and the McDonnell Miller PS 804 120 low water cutoffs wil...

Page 19: ...er cut off will shut down the burner if the water level in the boiler drops too low The control resets and restarts the burner with a call for heat a few seconds after the water is returned to its nor...

Page 20: ...t by the thermostat energizes the L8124C control which in turn energizes the R4184D primary control to turn on the burner If burner ignites within approximately 45 seconds and the cad cell sees flame...

Page 21: ...WITHOUT TANKLESS HEATERS set high limit dial on L8148 at 210 F This temperature may be varied to suit requirements of installation 6 On WATER BOILERS WITH TANKLESS HEATERS set operating control dial...

Page 22: ...the ability to control air by moving the head either forward or back Loosen the adjusting plate assembly hold down screw Slide the head and plate to the required firing rate setting as shown in Figure...

Page 23: ...service is complete be sure to fasten down the ignitor 7 FLAME FAILURE The V7 boiler controls operate the burner automatically If for unknown reasons the burner ceases to fire and the reset button on...

Page 24: ...at cell is securely in socket Reconnect leads Reset safety switch h Close line switch If burner starts and runs beyond safety switch cut out time cell is good If not install new cell 3 WARNING Check H...

Page 25: ...tion of mud scale etc and clean as required Examine all visible wiring for brittle or worn insulation and make sure electrical contacts are clean and that they function properly Give special attention...

Page 26: ...manner i Remove safety relief valve using extreme care to avoid damaging it ii Add an appropriate amount of Continue this slow boiling and trickle of overflow for several hours until the water coming...

Page 27: ...ceman to have 2 FLAME SHAPE Looking into the combustion chamber through the observation door the flame should appear straight with no sparklers rolling up toward the crown of the chamber If the flame...

Page 28: ...N This boiler contains controls which may cause the boiler to shut down and not restart without service If damage due to frozen pipes is a possibility the heating system should not be left unattended...

Page 29: ...ture fall R B will make and R W will break at 130 F Set low limit indicator at the minimum temperature recommended for domestic hot water supply This setting must be at least 20 F below high limit set...

Page 30: ...s necessary to allow removal of the jacket top panel and canopy smokebox c Remove the jacket top panel d Remove the canopy being careful not to damage the ceramic fiber gasket 5 Using a 1 diameter wir...

Page 31: ...er Illinois A Albany Fulton Montgomery B Loudoun Northampton and Indiana A Rensselaer Saratoga Prince William Counties Iowa A Schenectady Schoharie All other Counties A Kansas A Warren Washington Coun...

Page 32: ...32 BARE BOILER ASSEMBLY...

Page 33: ...ning Machined 71727036 1 1 1 1 1 1 1 6 5 Cast Iron Slip Nipple 7066003 1 2 3 4 5 6 7 8 7 2 Cast Iron Slip Nipple 7066001 1 4 2 6 3 4 5 6 7 8 8 Rear Target Wall Insulation 8202701 1 1 1 1 1 1 1 1 1 1 8...

Page 34: ...34 BARE BOILER ASSEMBLY CONTINUED...

Page 35: ...wing Door Mounting Plate 7172705 1 1 1 1 1 1 1 1 1 1 14A Burner Swing Door Mounting Plate Insulation 82027021 1 1 1 1 1 1 1 1 1 1 15 Rope Gasket Burner Mounting Plate 53 Lg 72027014 1 1 1 1 1 1 1 1 1...

Page 36: ...36 TS 39 112 D V713 and V714 FLUSH JACKET...

Page 37: ...de Top Panel Assembly 604270314 1 604270414 1 4 Jacket Top Panel Assembly 604270322 1 604270422 1 5 Jacket Lower Right Side Panel Assembly 604270337 1 604270437 1 6 Jacket Upper Right Side Access Pane...

Page 38: ...38 V72 Thru V79 FLUSH JACKET TS 39 109 D...

Page 39: ...acket Left Side Top Panel Assembly 604270241 1 604270341 1 604270441 1 604270541 1 604270641 1 604270741 1 604270841 1 604270941 1 5 Jacket Top Panel Assembly 604270221 1 604270321 1 604270421 1 60427...

Page 40: ...40 V73 Thru V79 STEAM BOILERS TRIM AND CONTROLS...

Page 41: ...Syphon NPT x 4 x 180 806603030 1 1 1 1 1 1 1 3D1 Bushing NPT x NPT 806600508 1 1 1 1 1 1 1 3D2 Elbow NPT 806601520 1 1 1 1 1 1 1 3D3 Nipple NPT x 2 806600003 1 1 1 1 1 1 1 3E Gage Glass Set 6 ConBraC...

Page 42: ...42 V72 Thru V79 V713 and V714 WATER BOILERS TRIM AND CONTROLS...

Page 43: ...1 1 1 1 1 1 1 1 3C Honeywell R4184D 1027 1001 Protectorelay 80160473 1 1 1 1 1 1 1 1 1 1 4 CIRCULATOR PIPING Packaged Boiler Only 4A Circulator Taco 007F position 2 8056007 1 1 1 1 1 1 1 1 1 1 4B Gas...

Page 44: ...44 Beckett AFG Burner...

Page 45: ...3 5503 5503 5503 5503 5503 5503 5503 5503 5503 Escutcheon Plate 3493 3493 3493 3493 3493 3493 3493 3493 Adjusting Plate Assembly 5941 5941 Head 5912 360003 4 360004 360006 5 360004 6 360006 7 360012 3...

Page 46: ...46 Print word document...

Page 47: ...47...

Reviews: