
25
Installation
2. Install control head
Guide rail
Puck
Guide rail
Puck
Figure 13:
Aligning the puck, series 20xx
ATTENTION!
Damaged printed circuit board or malfunction.
▶
Ensure that the puck is situated flat on the guide rail.
→
Push the control head onto the actuator. The puck must be aligned in such a way that it is inserted into
the guide rail of the control head.
→
Press the control head all the way down as far as the actuator and turn it into the required position.
Ensure that the pneumatic connections of the control head and those of the valve actuator are
situated preferably vertically one above the other (see “Figure 14: Installing the control head,
If they are positioned differently, longer hoses may be required other than those supplied in the
accessory kit.
english
Type 8695 REV.3
Summary of Contents for 8695 Series
Page 1: ...Operating Instructions Type 8695 REV 3 Control Head ...
Page 6: ...6 17 STORAGE 65 18 DISPOSAL 65 english Type 8695 REV 3 ...
Page 66: ...66 english Type 8695 REV 3 ...
Page 67: ......
Page 68: ...www burkert com ...